Box No. |
Box Name |
Folders |
Dates |
Dimensions |
Summary |
|
PF 1 |
Correspondence |
5 |
December 1989 - July 1991 |
0.23 |
Correspondence with Gary Banks (specifications consultant), with Ove Arup (structural engineers); Steelwork Shop drawings
|
PF 11 |
Reports |
11 |
1989-1990 |
0.2 |
Design Standards; Cost Consultant; Cost Construction Report; Event Room Options; Construction Cost by Program; Area Analysis; Schematic Design
|
PF 12 |
Progressive Drawings |
3 |
January 1990 - May 1990 |
0.32 |
Progressive Drawings and Originals
|
PF 13 |
Project manual; Drawings |
2 |
1990 |
0.13 |
A9 Series Drawings (partition types); Original Project Manual
|
PF 14 |
Correspondence |
2 |
1990-1991 |
0.05 |
Correspondence (Mulvey & Banani Electrical Consultants) Incoming and Outgoing |
PF 15 |
Lighting Agreement, Drawings, Architecht selection process documents |
2 |
1987-1990 |
0.08 |
List of Drawings; Summary of Selection Procedure of Applicants to Enter Phase II; Architectural Selection Committee; Submission/Proposal Documents; Selection Timetable; Lighting Design Agreement and Drawings
|
PF 19 |
Reports, Drawings, Cost Estimate |
13 |
1990 |
0.22 |
Cost Estimate (no. 3); Precast Specification; A9 Series Drawings (partition types); Theatre Equipment, Schematic Design Report, Room Finish Schedule, Addendum, Front and Back of House Architectural Drawings, Auditorium Sketches
|
PF 2 |
Drawings; Budget |
5 |
1990 |
0.18 |
Room list; Sketchbook Excerpts; Auditorium Description; Cost Estimates; Budget; Seat Count Study; Original Drawings
|
PF 20 |
Specifications; Correspondence |
10 |
1990 |
0.16 |
Specifications: Special Concrete Finishes; Corrrespondence (Structural Consultant); Precast Concrete; Building Envelop; Unit Masonry; Stone; Expasion Control; Joint Sealants; Wood Flooring
|
PF 21 |
Correspondence; Transmittals |
11 |
1989-1990 |
0.2 |
Correspondence (w/ Associate Architects; Fee Proposal; Project Schedule; Ballet Opera House Correspondence; RPA Consultants Ltd.)
|
PF 22 |
Meeting Minutes; Drawings |
14 |
1989-1990 |
0.2 |
Drawings (large); Transmittals (National Ballet Company); Meeting Minutes, Board Retreat Meeting; Building Committee; Ballet Opera House and Consultant Coordination Meetings; Design Team Meeting; Design Review Meeting; Mechanical Meeting Minutes; Drawings and Schedules
|
PF 23 |
Drawings; Pre-Cast Specifications |
26 |
1990 |
0.23 |
Addendum to Architectural Drawings; List of Drawing Addenda; Pre-cast Specifications; Drawings (Rooms - large scale)
|
PF 25 |
Budgets |
9 |
1990 |
0.14 |
Stages; Preformers Support, Pre-cast Concrete Sub-contractor; Budgets (PCL); Conceptual Budget Summary; Correspondence (PCL), Cost Estimates
|
PF 26 |
Contracts; Drawings |
4 |
1989-1990 |
0.07 |
Contruction Contract Agreement; Contract Negotiations; Correspodence (Concrete Consultant); Contruction Contract Details and Proposed Changes by PCL Constructors Eastern Inc.; Drawings
|
PF 27 |
Meeting Minutes, Correspondence |
10 |
1987-1990 |
0.23 |
Meeting Minutes; Meeting Schedules; Correspondence Boston/Toronto; Inter-Office Memos; Public Relations and Press, Architect Selection Process Safdie Team Third Phase; Prequalification Documents; Meeting Agendas
|
PF 29 |
Correspondence; Theatre files |
13 |
1988-1990 |
0.28 |
Correspondence (Theatre Consultants); Theatre Programme; Theatre Equipment Budget; Press Articles; Public Relations; National Ballet of Canada Media Kit; Marketing
|
PF 3 |
Contracts; Budget |
20 |
1987-1990 |
0.28 |
Agreements/Contracts; Fee Schedules; Budgets; Project Costs; Phase 2 Presentation Summary
|
PF 30 |
Correspondence; Buidling acoustics; Project manual |
12 |
1990 |
0.21 |
List of Specification Addenda; Project Manual (Precast concrete package); Correspondence/Transmittals (ARTEC - Building Acoustics); Acoustic Products; Area Calculations; Noise and Vibration Control
|
PF 36 |
Drawings; Contract/Agreement |
3 |
1990 |
0.17 |
A10 Series Drawings; Agreement Between Architect and Client
|
PF 37 |
Costs; Reports |
16 |
1990 |
0.18 |
Neighbourhood photos; Fact Sheet; Project Cost; Construction Cost; Program Analysis; Theatre Projects Consultants; Front of House Study; European Tour Notebook; Structure; Power and Lighting; Auditorium Proposal; Architectural Program; Schematic Design (Revision 19); transmittals from A.J. Vermeulen
|
PF 38 |
Manuals |
15 |
1990 |
0.41 |
Sets of Bound Project Manuals and Specification Manuals (Pedestrian Walkways, Mechanical, Support Pads, Precast Concrete, Trade Comparison); Sub Contracts; "A Ballet House for Canada" Executive Summary |
PF 6 |
Specifications; sub-contract amendments |
36 |
1990 |
0.09 |
Sub-contract amendments; Specifications; Library Sketches (copies)
|
PF 8 |
Project manual |
7 |
1985-1990 |
0.2 |
Project Manual; Building Programme; Architectural Brief; Architectural program; Theatre Equipment; Schematic Design Report; Proscenium Zone; Design Report Extract
|
PF 9 |
Transmittals |
11 |
1988-1989 |
0.25 |
Transmittals (incoming and outgoing); Planning Schedule; Auditorium Design; Programs; Design Schedule
|