i The Safdie Hypermedia Archive - Project Inventory


   Montreal Museum of Fine Arts


Record Count: 36

Folder No. Title Dates Drawing Type Medium Drawings Project Phase Set Description Set Designation Set Type

1 Assorted Drawings of Existing Building n.d., 1910-12, 1974, 1985-87 Ref, ExCon Mix 84 PP
2 Schematic Drawings and Studies: Plans, Sections, Elevations, Perspectives n.d., 29 Apr 87 Arch PT 14 SD
3 Assorted Contractors' Drawings (incl. Glazing, Metal, Masonry, Structural Steel) n.d., 1987-90 PT 84 CD
4 Schematic Drawings and Studies n.d., 2 Apr 87 - 21 Feb 89 Arch Mix 71 SD
5 Assorted Drawings by Other Architects: Entrance, Reception, 3430 du Musée, Victorian house renovations 1984-91 Arch PT 78 PP
6 Ceiling and Roof Plans; Skylight Studies n.d, 1 Apr 88 - 19 May 89 Arch Mix 23 DD
7 Structural Drawings - Final Set May 89 S PT 120 DD yes
8 Structural Design Drawings And Sketches 22 Dec 87 - 28 Mar 88 Arch Mix 29 SD
9 Schematic Designs, incl. Front Reception Area n.d. Arch Mix 55 SD
10 Schematic Designs n.d. Arch Mix 63 SD
11 Schematic design sketches: plans and studies by Moshe Safdie n.d. Arch TP 22 SD
11 Schematic design sketches: plans and studies n.d. Arch TP 88 SD
12 Design Development Sketches (Early Phases) and Schematic Design Studies n.d., 14 Jan 86 - 20 Oct 88 Arch Mix 153 SD, DD
13 Civil Engineering Drawings: Tunnel; Electrical & Lighting n.d., 4 Jun 87 - 19 Dec 88 Mix 45 SD
14 Gallery Studies n.d., 13 Mar - 22 Dec 87 Arch Mix 46 SD
15 Museum/Bell Enterprises, Schemes IV,V,VI; Design Development Sketches n.d., 4 Dec 85 - 11 Apr 86 Arch Mix 61 DD
16 Preliminary Schematic Design Sketches Oct - Dec 87 Arch Mix 40 SD
17 Schematic Design Drawings: Plans, Sections, Elevations Feb - 7 Jun 88 Arch M 47 SD
18 Schematic Designs: Site Plan, Elevations, Sections n.d., May 87 Arch Mix 12 SD
19 Cafeteria and Restaurant n.d., 14 Jan - 7 Jun 88 Arch Mix 9 DD
20 Early area studies and plans, Schemes A and B 1985 Arch TP 37 SD
20 Early studies by Moshe Safdie: Phase II sketches to Nov 12 1985 Sk. A and B 1985 Arch TP 40 SD
21 Interiors - Woodwork and Furniture Design 13 Mar 89 - 7 Jul 92 I Mix 113 DD
22 Structural Working Drawings - Progress Set n.d., 27 Mar - 23 Jun 88 S PT 49 DD
23 Pavement Design Sketches n.d. Arch Mix 19 DD
24 Architectural Progress Set 21 Jun 88 - 27 Jan 89 Arch Mix 100 DD
25 Working Drawings 20 Jun 89 Arch SP 24 DD
26 Working Drawings Lot 2 - Architectural Bid Set (Final) 19 May 89 Arch SP 122 DD
27 Preliminary Lighting Design 9 Dec 87 - 20 Nov 90 Elec PT 22 DD
28 Mechanical - Early Ventilation Drawings 22 Nov 88 - 11 Jan 89 Mech PT 17 SD
29 Ventilation and Heating Lot 2 19 May - 20 Jun 89 Mech PT 53
30 Plumbing Lot 2 19 May 89 P PT 42 DD
31 Electric Lighting; Lighting Details 12 Oct 88 - 28 Apr 89 Elec PT 33 DD
32 Electrical Lot 2 19 May 89 Elec PT 40 DD
33 Elevations - Final Presentation Drawings n.d. Arch M 11 DD
34 Original sketches and renderings by Moshe Safdie; framed 1987-89 Arch TP 24