Folder No. |
Title |
Dates |
Drawing Type |
Medium |
Drawings |
Project Phase |
Set Description |
Set Designation |
Set Type |
|
4 |
N.Y. Coliseum, Structural Boring Drawings (1 of 2) |
24 May 54 - 22 Jun 55 |
Ref |
PT |
33 |
PP |
|
|
office reference |
5 |
N.Y. Coliseum, Structural Boring Drawings (2 of 2) |
24 May 54 - 22 Jun 55 |
Ref |
PT |
33 |
PP |
|
|
office reference |
6 |
Originals of N.Y. Coliseum |
26 May 54 - 10 Aug 55 |
Ref |
PT |
66 |
PP |
|
|
office reference |
7 |
N.Y. Coliseum, Architectural Working Drawings (1 of 3) |
1 Oct 54 - 14 Nov 55 |
Ref |
PT |
25 |
PP |
|
|
office reference |
8 |
N.Y. Coliseum, Architectural Working Drawings (2 of 3) |
1 Oct 54 - 14 Nov 55 |
Ref |
PT |
25 |
PP |
|
|
office reference |
9 |
N.Y. Coliseum, Architectural Working Drawings (3 of 3) |
1 Oct 54 - 14 Nov 55 |
Ref |
PT |
26 |
PP |
|
|
office reference |
15 |
N.Y. Coliseum, Architectural Working Drawings (1 of 3) |
1 Mar 55 - 11 Aug 55 |
Ref |
PHC |
25 |
PP |
|
|
office reference |
16 |
N.Y. Coliseum, Architectural Working Drawings (2 of 3) |
1 Mar 55 - 11 Aug 55 |
Ref |
PHC |
25 |
PP |
|
|
office reference |
17 |
N.Y. Coliseum, Architectural Working Drawings (3 of 3) |
1 Mar 55 - 11 Aug 55 |
Ref |
PHC |
28 |
PP |
|
|
office reference |
33 |
N.Y. Coliseum, Structural Working Drawings (1 of 2) |
25 Mar 55 - 10 Aug 55 |
Ref |
V |
33 |
PP |
|
|
|
34 |
N.Y. Coliseum, Structural Working Drawings (2 of 2) |
25 Mar 55 - 10 Aug 55 |
Ref |
V |
34 |
PP |
|
|
|
35 |
N.Y. Coliseum Floor Plans |
8 Apr 55 - 12 Aug 55 |
Ref |
V, PHC |
27 |
PP |
|
|
|
47 |
Notational Scheme Drawings, N.Y. Coliseum (1 of 2) |
12 Oct 85 - 1 Nov 85 |
ExCon |
SP, M |
45 |
PP |
|
|
|
48 |
Notational Scheme Drawings, N.Y. Coliseum (2 of 2) |
12 Oct 85 - 1 Nov 85 |
ExCon |
SP, M |
47 |
PP |
|
|
|
52 |
10 Columbus Circle, Redrawn Architectural Floor Plans |
18 Mar 86 |
ExCon |
M, SP |
31 |
PP |
|
|
office reference |
53 |
10 Columbus Circle, Redrawn Architectural Plans and Sections (1 of 2) |
18 Mar 86 |
ExCon |
M, SP |
23 |
PP |
|
|
office reference |
54 |
10 Columbus Circle, Redrawn Architectural Plans and Sections (2 of 2) |
18 Mar 86 |
ExCon |
M, SP |
23 |
PP |
|
|
office reference |
55 |
10 Columbus Circle, Redrawn Architectural Plans |
18 Mar 86 |
ExCon |
V |
36 |
PP |
|
|
office reference |
56 |
10 Columbus Circle, Redrawn Architectural Floor Plans (1 of 3) |
18 Mar 86 |
ExCon |
M, SLK |
21 |
PP |
|
|
office reference |
57 |
10 Columbus Circle, Redrawn Architectural Floor Plans (2 of 3) |
18 Mar 86 |
ExCon |
M, SLK |
25 |
PP |
|
|
office reference |
58 |
10 Columbus Circle, Redrawn Architectural Floor Plans (3 of 3) |
18 Mar 86 |
ExCon |
M, SLK |
25 |
PP |
|
|
office reference |
59 |
10 Columbus Circle, Redrawn Architectural Floor Plans (1 of 2) |
18 Mar 86 - 30 Mar 87 |
ExCon |
PT |
24 |
PP |
|
|
office reference |
60 |
10 Columbus Circle, Redrawn Architectural Floor Plans (2 of 2) |
18 Mar 86 - 30 Mar 87 |
ExCon |
PT |
22 |
PP |
|
|
office reference |
61 |
10 Columbus Circle, Redrawn Architectural Floor Plans |
18 Mar 86 - 6 Mar 87 |
ExCon |
PT |
31 |
PP |
|
|
office reference |
62 |
10 Columbus Circle, Redrawn Architectural Floor Plans |
18 Mar 86 |
ExCon |
SP |
36 |
PP |
|
|
|
66 |
Zoning Calculations and Preliminary Survey |
n.d. |
Sd |
SP |
18 |
PP |
|
|
|
71 |
Environmental Impact Study |
26 Jan 86 |
Sd |
SP, M |
43 |
PP |
|
|
|
73 |
Area Calculation and Analysis Plans |
n.d. |
Arch |
PLTP |
47 |
PP |
|
|
|
74 |
Area Calculation Analysis, Zoning Calculations, and Massing Schemes |
n.d., 4 Apr 85 - 2 Sept 85 |
Arch |
Mix |
81 |
PP |
|
|
|
84 |
Calculation Set for Zoning (1 of 2) |
10 Mar 86 |
Arch |
PT |
20 |
PP |
|
|
office review |
85 |
Calculation Set for Zoning (2 of 2) |
10 Mar 86 |
Arch |
PT |
21 |
PP |
|
|
office review |
92 |
Area Calculations for Zoning and F.A.R. (1 of 5) |
26 Jun 86 - 11 Nov 86 |
Arch |
SP |
35 |
PP |
|
|
|
93 |
Area Calculations for Zoning and F.A.R. (2 of 5) |
26 Jun 86 - 11 Nov 86 |
Arch |
SP |
35 |
PP |
|
|
|
94 |
Area Calculations for Zoning and F.A.R. (3 of 5) |
26 Jun 86 - 11 Nov 86 |
Arch |
SP |
36 |
PP |
|
|
|
95 |
Area Calculations for Zoning and F.A.R. (4 of 5) |
26 Jun 86 - 11 Nov 86 |
Arch |
SP |
36 |
PP |
|
|
|
96 |
Area Calculations for Zoning and F.A.R. (5 of 5) |
26 Jun 86 - 11 Nov 86 |
Arch |
SP |
30 |
PP |
|
|
|
98 |
Preliminary Design Strategy Drawings |
30 Sept 86 - 20 May 87 |
Arch, Sd |
Mix |
38 |
PP |
|
|
|
102 |
Proposal for Purchase Set |
n.d., 1 May 85 |
Arch |
M |
17 |
SD |
|
|
presentation |
103 |
Proposal for Purchase Set |
n.d., 1 May 85 |
Arch |
SP |
13 |
SD |
|
|
presentation |
104 |
Early Proposal for Purchase Set |
n.d., 1 May 85 |
Arch |
PT |
34 |
SD |
|
|
presentation |
105 |
Architectural Tower Elevations |
15 Jul 85 - 14 Apr 86 |
Arch |
PT, V |
5 |
SD |
|
|
|
111 |
Alternative Massing Schemes for Building Core (1 of 2) |
19 Sept 85 - 14 Nov 85 |
Arch |
M, SP |
38 |
SD |
|
|
|
112 |
Alternative Massing Schemes for Building Core (2 of 2) |
19 Sept 85 - 14 Nov 85 |
Arch |
M, SP |
39 |
SD |
|
|
|
113 |
Preliminary Plans, Sky lobby, Hotel Health Club, and Residential Studies |
n.d., 1 Oct 85 - 22 Jan 86 |
Arch |
Mix |
56 |
SD |
|
|
|
114 |
Preliminary Layout Drawings for Certification Submission |
n.d., 7 Oct 85 - 13 May 86 |
Arch |
Mix |
46 |
SD |
|
|
|
132 |
Site Development Drawings for Roof Garden (1 of 2) |
3 Nov 86 - 27 Mar 87 |
Sd |
Mix |
33 |
DD |
|
|
|
133 |
Site Development Drawings for Roof Garden (2 of 2) |
3 Nov 86 - 27 Mar 87 |
Sd |
Mix |
35 |
DD |
|
|
|
135 |
Landscape Site Design Drawings |
27 Mar 87 - 15 Jun 87 |
Sd |
Mix |
45 |
DD |
|
|
|
138 |
Preliminary Steel Frame and Wind Frame Drawings (1 of 2) |
26 Sept 85 - 23 Feb 87 |
S |
SP, PT |
25 |
DD |
|
|
|
139 |
Preliminary Steel Frame and Wind Frame Drawings (2 of 2) |
26 Sept 85 - 23 Feb 87 |
S |
SP, PT |
24 |
DD |
|
|
|
140 |
Framing Plan Drawings (1 of 2) |
6 Feb 86 - 4 Mar 87 |
S |
PT, SP |
28 |
DD |
|
|
office review |
141 |
Framing Plan Drawings (2 of 2) |
6 Feb 86 - 4 Mar 87 |
S |
PT, SP |
26 |
DD |
|
|
office review |
142 |
Framing Plan Support Drawings (1 of 2) |
24 Apr 86 |
S |
SP |
24 |
DD |
|
|
|
143 |
Framing Plan Support Drawings (2 of 2) |
24 Apr 86 |
S |
SP |
25 |
DD |
|
|
|
144 |
Preliminary Framing and Column Grid Support Drawings |
24 Apr 86 |
S |
PT |
15 |
DD |
|
|
|
145 |
Preliminary Structural System Layout Drawings (1 of 2) |
n.d., 4 Jun 86 |
S |
PLTP |
25 |
DD |
|
|
office review |
146 |
Preliminary Structural System Layout Drawings (2 of 2) |
n.d., 4 Jun 86 |
S |
PLTP |
26 |
DD |
|
|
office review |
147 |
Structural Loading Drawings |
11 Nov 86 |
S |
PT |
22 |
DD |
|
|
|
148 |
Preliminary Framing Plan Drawings |
6 Feb 86 - 23 Apr 87 |
S |
PT, SP |
27 |
DD |
|
|
|
149 |
Preliminary Framing Plan Drawings |
16 Feb 87 - 11 Mar 87 |
S |
SP |
11 |
DD |
|
|
|
150 |
Preliminary Framing Plan Drawings |
3 Mar 86 - 11 May 87 |
S |
SP, PT |
32 |
DD |
|
|
|
151 |
10 Columbus Circle, Insulation of Super Columns |
9 Mar 87 - 30 Mar 87 |
S |
PT |
16 |
DD |
|
|
office review |
155 |
Architectural Plans and Preferred Massing Drawings |
n.d. |
Arch |
PT |
22 |
DD |
|
|
|
157 |
Preliminary Building Layout Drawings |
n.d. |
Arch |
V |
39 |
DD |
|
|
|
158 |
Elevations, Crest Isometric, Retail, and Building Street Relationship Studies |
n.d. |
Arch, Sd |
Mix |
25 |
DD |
|
|
|
167 |
Tower Design Development (1 of 2) |
11 Aug 85 - 24 Sept 85 |
Arch |
Mix |
28 |
DD |
|
|
|
168 |
Tower Design Development (2 of 2) |
11 Aug 85 - 24 Sept 85 |
Arch |
Mix |
30 |
DD |
|
|
|
172 |
Elevation Studies (1 of 2) |
11 Sept 85 - 19 Dec 85 |
Arch |
M, SP |
30 |
DD |
|
|
|
173 |
Elevation Studies (2 of 2) |
11 Sept 85 - 19 Dec 85 |
Arch |
M, SP |
33 |
DD |
|
|
|
174 |
Window Opening Comparison Design Study Drawings |
n.d., 17 Oct 85 - 24 Jul 86 |
Arch |
Mix |
39 |
DD |
|
|
|
177 |
Elevation Studies |
25 Oct 85 - 22 Sept 86 |
Arch |
SP, M |
39 |
DD |
|
|
|
180 |
Elevation Studies |
6 Nov 85 - 22 Nov 85 |
Arch |
M, SP |
22 |
DD |
|
|
|
181 |
Elevation Studies |
15 Nov 85 - 21 Nov 85 |
Arch |
Mix |
8 |
DD |
|
|
|
188 |
Residential Elevation and Plan Studies |
n.d., 18 Dec 85 - 13 Jan 86 |
Arch |
SP, PT |
26 |
DD |
|
|
|
189 |
Elevation Studies (1 of 2) |
23 Dec 85 - 28 Apr 86 |
Arch |
SP, M |
30 |
DD |
|
|
|
190 |
Elevation Studies (2 of 2) |
23 Dec 85 - 28 Apr 86 |
Arch |
SP, M |
30 |
DD |
|
|
|
191 |
Diagonal Bracing Studies |
2 Jan 86 - 17 Jul 86 |
Arch, S |
Mix |
59 |
DD |
|
|
|
192 |
Cutback Study Showing Alternatives |
4 Jan 86 - 14 Jan 86 |
Arch |
PT, SP |
11 |
DD |
|
|
|
193 |
Certification Set for Zoning and F.A.R. |
n.d., 9 Jan 86 - 11 Jun 86 |
Arch |
M |
13 |
DD |
|
|
office review |
194 |
Studies of Tower and Building Elevations |
13 Jan 86 - 15 Jan 86 |
Arch |
Mix |
11 |
DD |
|
|
|
195 |
Elevation Studies |
14 Jan 86 - 11 Sept 86 |
Arch |
SP, M |
31 |
DD |
|
|
|
196 |
Pre-Certification Residential Presentation Drawings (1 of 2) |
22 Jan 86 - 29 Apr 87 |
Arch |
Mix |
25 |
DD |
|
|
presentation |
197 |
Pre-Certification Residential Presentation Drawings (2 of 2) |
22 Jan 86 - 29 Apr 87 |
Arch |
Mix |
21 |
DD |
|
|
presentation |
198 |
Preliminary Residential Unit Drawings (1 of 2) |
10 Feb 86 - 1 Aug 86 |
Arch |
SP, M |
25 |
DD |
|
|
|
199 |
Preliminary Residential Unit Drawings (2 of 2) |
10 Feb 86 - 1 Aug 86 |
Arch |
SP, M |
22 |
DD |
|
|
|
209 |
Window Washing System Studies (1 of 2) |
27 Feb 86 - 28 May 87 |
Arch |
Mix |
27 |
DD |
|
|
|
210 |
Window Washing System Studies (2 of 2) |
27 Feb 86 - 28 May 87 |
Arch |
Mix |
36 |
DD |
|
|
|
212 |
Floor Plan and Section Study Drawings with Theater Plan (1 of 2) |
10 Mar 86 - 8 May 86 |
Arch |
Mix |
25 |
DD |
|
|
|
213 |
Floor Plan and Section Study Drawings with Theater Plan (2 of 2) |
10 Mar 86 - 8 May 86 |
Arch |
Mix |
23 |
DD |
|
|
|
214 |
Vertical Transportation Diagrams, Core, and Apartment Plans (1 of 2) |
n.d., 10 Mar 86 - 16 Jul 86 |
Arch |
Mix |
27 |
DD |
|
|
|
215 |
Vertical Transportation Diagrams, Core, and Apartment Plans (2 of 2) |
n.d., 10 Mar 86 - 16 Jul 86 |
Arch |
Mix |
25 |
DD |
|
|
|
218 |
Preliminary Pricing Set for Curtain Wall Details |
10 Mar 86 - 22 May 87 |
Arch |
Mix |
48 |
CD |
|
|
tender |
219 |
Comparative Option Drawings (1 of 2) |
n.d., 10 Mar 86 |
Arch |
PT |
80 |
DD |
|
|
office review |
220 |
Comparative Option Drawings (2 of 2) |
n.d., 10 Mar 86 |
Arch |
PT |
58 |
DD |
|
|
office review |
232 |
Conceptual Building Scheme (1 of 2) |
12 Mar 86 |
Arch |
SP |
25 |
DD |
|
|
|
233 |
Conceptual Building Scheme (2 of 2) |
12 Mar 86 |
Arch |
SP |
25 |
DD |
|
|
|
242 |
Preliminary Pricing Set for Certification |
10 Apr 86 - 19 May 86 |
Arch |
SP |
21 |
DD |
|
|
tender |
248 |
Residential Schematic Unit Plans |
n.d., 17 Apr 86 - 26 Jul 86 |
Arch |
M, TP |
52 |
DD |
|
|
|
249 |
Detail Design Drawings for Sloped Glazing (1 of 2) |
n.d., 6 May 86 - 8 Jul 87 |
Arch |
Mix |
53 |
DD |
|
|
|
250 |
Detail Design Drawings for Sloped Glazing (2 of 2) |
n.d., 6 May 86 - 8 Jul 87 |
Arch |
Mix |
57 |
DD |
|
|
|
254 |
Atrium Glazing Studies |
n.d., 16 May 86 |
Arch |
Mix |
99 |
DD |
|
|
|
255 |
Massing and Elevation Drawings and Interior Elevator Designations |
n.d., 27 May 86 - 29 May 86 |
Arch |
Mix |
20 |
DD |
|
|
|
256 |
Residential Unit Layout Drawings |
5 Jun 86 - 8 Jul 86 |
Arch |
Mix |
41 |
DD |
|
|
|
262 |
Window Pressure Diagram Drawings |
9 Jun 86 - 28 May 87 |
Arch, S |
M, SP |
21 |
DD |
|
|
|
268 |
Window Washing System Drawings |
n.d., 26 Jun 86 - 17 Jan 87 |
Arch |
Mix |
29 |
DD |
|
|
|
269 |
Diagonal Bracing Studies |
26 Jun 86 - 27 Aug 86 |
Arch, S |
PT |
38 |
DD |
|
|
office review |
270 |
Certification Set for Zoning and F.A.R. (1 of 2) |
26 Jun 86 - 30 Jun 86 |
Arch |
PT |
19 |
DD |
|
|
office review |
271 |
Certification Set for Zoning and F.A.R. (2 of 2) |
26 Jun 86 - 30 Jun 86 |
Arch |
PT |
20 |
DD |
|
|
office review |
272 |
Floor Plans for Certification Set |
26 Jun 86 - 30 Jun 86 |
Arch |
SP, M |
27 |
DD |
|
|
office review |
273 |
Floor Plans for Certification Set |
26 Jun 86 |
Arch |
SP |
18 |
DD |
|
|
office review |
274 |
Plans and Elevations for Certification Set |
26 Jan 86 - 30 Jun 86 |
Arch |
PT |
27 |
DD |
|
|
office review |
276 |
Residential Schematic Plans (1 of 2) |
14 Jul 86 - 1 Aug 86 |
Arch |
PLTP, SP |
28 |
DD |
|
|
|
277 |
Residential Schematic Plans (2 of 2) |
14 Jul 86 - 1 Aug 86 |
Arch |
PLTP, SP |
21 |
DD |
|
|
|
282 |
Conceptual Building Scheme (1 of 2) |
28 Jul 86 |
Arch |
SP |
26 |
DD |
|
|
|
283 |
Conceptual Building Scheme (2 of 2) |
28 Jul 86 |
Arch |
SP |
27 |
DD |
|
|
|
291 |
Residential Pricing Set Reductions (1 of 2) |
27 Aug 86 - 15 Dec 86 |
Arch |
SP, V |
50 |
DD |
|
|
office review |
292 |
Residential Pricing Set Reductions (2 of 2) |
27 Aug 86 - 15 Dec 86 |
Arch |
SP, V |
53 |
DD |
|
|
office review |
293 |
Certification Set, Floor Plans |
27 Aug 86 |
Arch |
V |
34 |
DD |
|
|
office review |
294 |
Certification Set, Floor Plans (1 of 2) |
27 Aug 86 |
Arch |
SP |
28 |
DD |
|
|
office review |
295 |
Certification Set, Floor Plans (2 of 2) |
27 Aug 86 |
Arch |
SP |
29 |
DD |
|
|
office review |
301 |
Certification Set for Zoning and F.A.R. |
n.d., 8 Sept 86 - 11 Nov 86 |
Arch |
SP |
39 |
DD |
|
|
office review |
303 |
Certification Set, Floor Plans (1 of 2) |
n.d., 8 Sept 86 - 25 Sept 86 |
Arch |
M, V |
32 |
DD |
|
|
office review |
304 |
Certification Set, Floor Plans (2 of 2) |
n.d., 8 Sept 86 - 25 Sept 86 |
Arch |
M, V |
32 |
DD |
|
|
office review |
308 |
Clone Building Early Sketches (1 of 4) |
n.d., 11 Sept 86 - 2 Dec 86 |
Arch, ExCon |
Mix |
46 |
DD |
|
|
|
309 |
Clone Building Early Sketches (2 of 4) |
n.d., 11 Sept 86 - 2 Dec 86 |
Arch, ExCon |
Mix |
57 |
DD |
|
|
|
310 |
Clone Building Early Sketches (3 of 4) |
n.d., 11 Sept 86 - 2 Dec 86 |
Arch, ExCon |
Mix |
46 |
DD |
|
|
|
311 |
Clone Building Early Sketches (4 of 4) |
n.d., 11 Sept 86 - 2 Dec 86 |
Arch, ExCon |
Mix |
48 |
DD |
|
|
|
312 |
Galleria Detail Studies (1 of 2) |
16 Sept 86 - 24 May 87 |
Arch |
M, SP |
25 |
DD |
|
|
|
313 |
Galleria Detail Studies (2 of 2) |
16 Sept 86 - 24 May 87 |
Arch |
M, SP |
26 |
DD |
|
|
|
320 |
Theater Study, Structural Transfer, and Assorted Schemes |
24 Sept 86 - 7 Jan 87 |
Arch, S |
SP, M |
41 |
DD |
|
|
|
322 |
Galleria Glazing Detail Drawings |
10 Oct 86 - 1 Jul 87 |
Arch |
Mix |
24 |
DD |
|
|
|
323 |
Floor Plan Design Development Drawings (1 of 5) |
n.d., 11 Nov 86 - 10 Nov 87 |
Arch |
Mix |
45 |
DD |
|
|
|
324 |
Floor Plan Design Development Drawings (2 of 5) |
n.d., 11 Nov 86 - 10 Nov 87 |
Arch |
Mix |
44 |
DD |
|
|
|
325 |
Floor Plan Design Development Drawings (3 of 5) |
n.d., 11 Nov 86 - 10 Nov 87 |
Arch |
Mix |
45 |
DD |
|
|
|
326 |
Floor Plan Design Development Drawings (4 of 5) |
n.d., 11 Nov 86 - 10 Nov 87 |
Arch |
Mix |
44 |
DD |
|
|
|
327 |
Floor Plan Design Development Drawings (5 of 5) |
n.d., 11 Nov 86 - 10 Nov 87 |
Arch |
Mix |
48 |
DD |
|
|
|
329 |
Comparison F.A.R. 18 to F.A.R. 15 |
n.d., 11 Nov 86 - 22 Oct 87 |
Arch |
Mix |
73 |
DD |
|
|
|
332 |
Floor Plan and Pier Scheme Drawings |
12 Nov 86 - 13 Jan 87 |
Arch |
Mix |
29 |
DD |
|
|
office review |
333 |
Core Studies (1 of 2) |
n.d., 13 Nov 86 - 19 Dec 86 |
Arch |
SP, M |
24 |
DD |
|
|
|
334 |
Core Studies (2 of 2) |
n.d., 13 Nov 86 - 19 Dec 86 |
Arch |
SP, M |
25 |
DD |
|
|
|
342 |
Window Glazing and Conceptual Layout of Rooftop |
n.d., 19 Nov 86 - 27 Jul 87 |
Arch |
Mix |
31 |
DD |
|
|
|
343 |
Residential Penthouse Plans and Original Apartment Layout Sketches |
20 Nov 86 - 1 Apr 87 |
Arch |
Mix |
76 |
DD |
|
|
|
349 |
Base Building Exterior Glazing Design Studies (1 of 2) |
n.d., 1 Dec 86 - 6 May 87 |
Arch |
PT |
24 |
DD |
|
|
office review |
350 |
Base Building Exterior Glazing Design Studies (2 of 2) |
n.d., 1 Dec 86 - 6 May 87 |
Arch |
PT |
25 |
DD |
|
|
office review |
351 |
Window Washing System Drawings (1 of 2) |
1 Dec 86 - 18 May 87 |
Arch |
M, SP |
20 |
DD |
|
|
|
352 |
Window Washing System Drawings (2 of 2) |
1 Dec 86 - 18 May 87 |
Arch |
M, SP |
24 |
DD |
|
|
|
356 |
Certification Set for Zoning and F.A.R. |
5 Dec 86 - 10 Dec 86 |
Arch |
PT |
26 |
DD |
|
|
office review |
357 |
Certification Set for Zoning and FAR |
10 Dec 86 |
Arch |
V |
90 |
DD |
|
|
office review |
365 |
Floor Plans for Egress, Fire Protection, and Zoning Review (1 of 2) |
15 Dec 86 |
Arch, P |
SP |
21 |
DD |
|
|
office review |
366 |
Floor Plans for Egress, Fire Protection, and Zoning Review (2 of 2) |
15 Dec 86 |
Arch, P |
SP |
21 |
DD |
|
|
office review |
372 |
Plans for Residential Units (1 of 2) |
n.d., 1 Jan 87 - 24 Feb 87 |
Arch |
Mix |
31 |
DD |
|
|
|
373 |
Plans for Residential Units (2 of 2) |
n.d., 1 Jan 87 - 24 Feb 87 |
Arch |
Mix |
31 |
DD |
|
|
|
375 |
Theater Plan Studies (1 of 2) |
6 Jan 87 |
Arch |
PT |
20 |
DD |
|
|
office review |
376 |
Theater Plan Studies (2 of 2) |
6 Jan 87 |
Arch |
PT |
20 |
DD |
|
|
office review |
389 |
Residential Unit Studies (1 of 2) |
13 Feb 87 - 29 Apr 87 |
Arch |
Mix |
21 |
DD |
|
|
|
390 |
Residential Unit Studies (2 of 2) |
13 Feb 87 - 29 Apr 87 |
Arch |
Mix |
24 |
DD |
|
|
|
391 |
Filing Set for Egress, Fire Protection, and Zoning Review (1 of 4) |
15 Feb 87 |
Arch, P |
SP |
25 |
DD |
|
|
office review |
392 |
Filing Set for Egress, Fire Protection, and Zoning Review (2 of 4) |
15 Feb 87 |
Arch, P |
SP |
25 |
DD |
|
|
office review |
393 |
Filing Set for Egress, Fire Protection, and Zoning Review (3 of 4) |
15 Feb 87 |
Arch, P |
SP |
25 |
DD |
|
|
office review |
394 |
Filing Set for Egress, Fire Protection, and Zoning Review (4 of 4) |
15 Feb 87 |
Arch, P |
SP |
26 |
DD |
|
|
office review |
399 |
Galleria Elevational Studies (1 of 2) |
6 Mar 87 - 2 Jun 87 |
Arch |
Mix |
24 |
DD |
|
|
|
400 |
Galleria Elevational Studies (2 of 2) |
6 Mar 87 - 2 Jun 87 |
Arch |
Mix |
18 |
DD |
|
|
|
402 |
Glazing Detail and Skylight Studies |
18 Mar 87 - 20 Mar 87 |
Arch |
PT |
12 |
DD |
|
|
|
405 |
Residential Atrium Sections and Elevations (1 of 2) |
n.d., 4 Apr 87 - 6 Jul 87 |
Arch |
Mix |
39 |
DD |
|
|
|
406 |
Residential Atrium Sections and Elevations (2 of 2) |
n.d., 4 Apr 87 - 6 Jul 87 |
Arch |
Mix |
32 |
DD |
|
|
|
409 |
Precast Panel Cladding Studies for Galleria |
n.d., 8 Apr 87 - 1 May 87 |
Arch |
SP, M |
15 |
DD |
|
|
|
411 |
Design Drawings for Grading Auto Drop-Off (1 of 2) |
n.d., 13 Apr 87 - 24 Jun 87 |
Arch |
Mix |
108 |
DD |
|
|
|
412 |
Design Drawings for Grading Auto Drop-Off (2 of 2) |
n.d., 13 Apr 87 - 24 Jun 87 |
Arch |
Mix |
120 |
DD |
|
|
|
418 |
Residential Unit Studies (1 of 2) |
20 May 87 - 30 Jul 87 |
Arch |
PT |
55 |
DD |
|
|
|
419 |
Residential Unit Studies (2 of 2) |
20 May 87 - 30 Jul 87 |
Arch |
PT |
58 |
DD |
|
|
|
422 |
Galleria Precast Elevation Studies |
n.d., 2 Jun 87 |
Arch |
Mix |
38 |
DD |
|
|
|
423 |
Residential Construction Schedule and Structural Loading Plans |
4 Jun 87 - 11 Nov 87 |
Arch, S |
PT |
33 |
DD |
|
|
office review |
429 |
Exterior Building Enclosure (1 of 2) |
1 Jul 87 - 10 Aug 87 |
Arch |
PT |
28 |
DD |
|
|
office review |
430 |
Exterior Building Enclosure (2 of 2) |
1 Jul 87 - 10 Aug 87 |
Arch |
PT |
26 |
DD |
|
|
office review |
437 |
Lobby Presentation Sectional Drawings |
n.d., 6 Jul 87 |
Arch |
Mix |
9 |
DD |
|
|
|
447 |
Floor Plans, Design Development Drawings (1 of 5) |
n.d., 10 Aug 87 - 1 Nov 87 |
Arch |
Mix |
45 |
DD |
|
|
|
448 |
Floor Plans, Design Development Drawings (2 of 5) |
n.d., 10 Aug 87 - 1 Nov 87 |
Arch |
Mix |
45 |
DD |
|
|
|
449 |
Floor Plans, Design Development Drawings (3 of 5) |
n.d., 10 Aug 87 - 1 Nov 87 |
Arch |
Mix |
45 |
DD |
|
|
|
450 |
Floor Plans, Design Development Drawings (4 of 5) |
n.d., 10 Aug 87 - 1 Nov 87 |
Arch |
Mix |
50 |
DD |
|
|
|
451 |
Floor Plans, Design Development Drawings (5 of 5) |
n.d., 10 Aug 87 - 1 Nov 87 |
Arch |
Mix |
45 |
DD |
|
|
|
452 |
Public Spaces Design Development Set (1 of 4) |
10 Aug 87 |
Arch |
PT |
28 |
DD |
|
|
presentation |
453 |
Public Spaces Design Development Set (2 of 4) |
10 Aug 87 |
Arch |
PT |
28 |
DD |
|
|
presentation |
454 |
Public Spaces Design Development Set (3 of 4) |
10 Aug 87 |
Arch |
PT |
28 |
DD |
|
|
presentation |
455 |
Public Spaces Design Development Set (4 of 4) |
10 Aug 87 |
Arch |
PT |
28 |
DD |
|
|
presentation |
458 |
Lighting Design Drawing |
3 Sept 87
|
Arch, Elec |
M |
11 |
DD |
|
|
|
462 |
Comparison F.A.R. 18 to F.A.R. 15 |
n.d., 21 Oct 87 |
Arch |
Mix |
106 |
DD |
|
|
|
500 |
Pre-Demolition Filing Set |
8 Jan 87 |
Dem |
PT |
22 |
CD |
|
|
office review |
501 |
Demolition Drawings (1 of 2) |
23 Feb 87 |
Dem |
PT |
22 |
CD |
|
|
office review |
502 |
Demolition Drawings (2 of 2) |
23 Feb 87 |
Dem |
PT |
23 |
CD |
|
|
office review |
503 |
Structural Demolition Drawings |
23 Feb 87 - 30 Mar 87 |
Dem |
PT |
14 |
CD |
|
|
office review |
504 |
Demolition Drawings Issued for Filing; Street Level (1 of 2) |
23 Feb 87 |
Dem |
SP |
22 |
CD |
|
|
|
505 |
Demolition Drawings Issued for Filing; Street Level (2 of 2) |
23 Feb 87 |
Dem |
SP |
22 |
CD |
|
|
|
506 |
Pricing Drawings for Alterations to the N.Y. Coliseum Demolition (1 of 2) |
25 Feb 87 |
Dem |
PT |
24 |
CD |
|
|
presentation |
507 |
Pricing Drawings for Alterations to the N.Y. Coliseum Demolition (2 of 2) |
25 Feb 87 |
Dem |
PT |
24 |
CD |
|
|
presentation |
508 |
Pre-Demolition Filing Set, Architectural and Structural (1 of 2) |
12 Mar 87 |
Dem |
PT |
28 |
CD |
|
|
office review |
509 |
Pre-Demolition Filing Set, Architectural and Structural (2 of 2) |
12 Mar 87 |
Dem |
PT |
28 |
CD |
|
|
office review |
510 |
Structural Demolition and Foundation Drawings (1 of 2) |
30 Mar 87 - 8 Jun 87 |
Dem |
M, SP |
20 |
CD |
|
|
|
511 |
Structural Demolition and Foundation Drawings (2 of 2) |
30 Mar 87 - 8 Jun 87 |
Dem |
M, SP |
20 |
CD |
|
|
|
512 |
Galleria Atrium Landscape Drawings (1 of 2) |
10 May 87 |
Sd, Arch |
Mix |
22 |
CD |
|
|
|
513 |
Galleria Atrium Landscape Drawings (2 of 2) |
10 May 87 |
Sd, Arch |
Mix |
22 |
CD |
|
|
|
514 |
Sidewalk Paving Plans |
1 Jul 87 |
Sd |
SP |
8 |
CD |
|
|
|
515 |
Pricing Set, Structural Drawings (1 of 3) |
8 May 86 - 7 Aug 86 |
S |
PT |
25 |
CD |
|
|
tender |
516 |
Pricing Set, Structural Drawings (2 of 3) |
8 May 86 - 7 Aug 86 |
S |
PT |
25 |
CD |
|
|
tender |
517 |
Pricing Set, Structural Drawings (3 of 3) |
8 May 86 - 7 Aug 86 |
S |
PT |
25 |
CD |
|
|
tender |
518 |
Temporary Bracing System and Foundation Excavation, Clone Building |
17 Nov 86 - 23 Feb 87 |
S |
PT, M |
12 |
CD |
|
|
|
521 |
Foundation Drawings and Details (1 of 2) |
30 Jan 87 - 23 Feb 87 |
S |
SP |
20 |
CD |
|
|
|
522 |
Foundation Drawings and Details (2 of 2) |
30 Jan 87 - 23 Feb 87 |
S |
SP |
20 |
CD |
|
|
|
523 |
Foundation Package Detail Drawings |
16 Mar 87 - 30 Mar 87 |
S |
SP |
37 |
CD |
|
|
|
524 |
Foundation Package Drawings (1 of 2) |
16 Mar 87 - 14 May 87 |
S |
Mix |
26 |
CD |
|
|
|
525 |
Foundation Package Drawings (2 of 2) |
16 Mar 87 - 14 May 87 |
S |
Mix |
26 |
CD |
|
|
|
526 |
Foundation Drawings |
30 Mar 87 - 21 May 87 |
S |
PT |
67 |
CD |
|
|
office review |
527 |
Mill Order Package Drawings |
4 May 87 - 31 Aug 87 |
S |
PT |
58 |
CD |
|
|
office review |
528 |
Mill Order Package Drawings (1 of 2) |
4 May 87 |
S |
SP |
24 |
CD |
|
|
|
529 |
Mill Order Package Drawings (2 of 2) |
4 May 87 |
S |
SP |
24 |
CD |
|
|
|
530 |
Foundation Package Drawings |
21 May 87 - 8 Jun 87 |
S |
PT |
23 |
CD |
|
|
office review |
531 |
Steel Support Framing Drawings |
22 May 87 - 14 Jul 87 |
S |
PT, SP |
33 |
CD |
|
|
|
532 |
Mill Order Package Drawings, rev. 3 |
26 Jun 87 |
S |
PT |
16 |
CD |
|
|
office review |
533 |
Mill Order Package Drawings, rev. 4 (1 of 2) |
2 Jul 87 |
S |
PT |
19 |
CD |
|
|
office review |
534 |
Mill Order Package Drawings, rev. 4 (2 of 2) |
2 Jul 87 |
S |
PT |
19 |
CD |
|
|
office review |
535 |
Mill Order Package Drawings |
2 Jul 87 - 3 Aug 87 |
S |
PT |
72 |
CD |
|
|
office review |
536 |
Steel Framing, Mill Order Package |
24 Jul 87 |
S |
PT |
28 |
CD |
|
|
office review |
537 |
Mill Order Package Drawings, no. 1 |
3 Aug 87 |
S |
PT |
34 |
CD |
|
|
office review |
538 |
Mill Order Package Drawings, no. 1 |
17 Aug 87 |
S |
PT |
28 |
CD |
|
|
office review |
539 |
Mill Order Package Drawings, no. 1 |
31 Aug 87 - 13 Oct 87 |
S |
PT |
30 |
CD |
|
|
office review |
540 |
Mill Order Package Drawings |
13 Oct 87 |
S |
PT |
24 |
CD |
|
|
office review |
541 |
"Storybook" Original Drawings |
n.d. |
Arch |
SP, V |
48 |
CD |
|
|
|
542 |
"Storybook" Mock-Ups (1 of 2) |
n.d. |
Arch |
PT |
54 |
CD |
|
|
office review |
543 |
"Storybook" Mock-Ups (2 of 2) |
n.d. |
Arch |
PT |
59 |
CD |
|
|
office review |
544 |
Core Floor Plans (1 of 2) |
n.d. |
Arch |
M |
17 |
CD |
|
|
|
545 |
Core Floor Plans (2 of 2) |
n.d. |
Arch |
M |
15 |
CD |
|
|
|
546 |
Window Washing Equipment Drawings |
n.d., 4 Mar 86 - 14 May 86 |
Arch |
M |
17 |
CD |
|
|
|
547 |
Trading Floor and Tower Plan Drawings |
14 Apr 86 |
Arch |
SP |
21 |
CD |
|
|
tender |
548 |
Trading Floor, Tower Plan Drawings, and Coordination Office Plans |
15 Apr 86 - 18 Jun 86 |
Arch |
SP, M |
25 |
CD |
|
|
tender |
550 |
Stone Paving Surfaces |
9 Jun 86 |
Arch, Sd |
M |
30 |
CD |
|
|
|
551 |
Stone Package Drawings (1 of 2) |
9 Jun 86 |
Arch |
PT |
29 |
CD |
|
|
office review |
552 |
Stone Package Drawings (2 of 2) |
9 Jun 86 |
Arch |
PT |
13 |
CD |
|
|
office review |
553 |
Marked-Up Stone Package Drawings |
9 Jun 86 - 11 Jul 86 |
Arch |
SP |
22 |
DD |
|
|
office review |
554 |
Certification Set for Zoning, F.A.R. and Encroachment Drawings (1 of 4) |
26 Jun 86 - 30 Jun 86 |
Arch, Sd |
PT |
23 |
CD |
|
|
tender |
555 |
Certification Set for Zoning, F.A.R. and Encroachment Drawings (2 of 4) |
26 Jun 86 - 30 Jun 86 |
Arch, Sd |
PT |
23 |
CD |
|
|
tender |
556 |
Certification Set for Zoning, F.A.R. and Encroachment Drawings (3 of 4) |
26 Jun 86 - 30 Jun 86 |
Arch, Sd |
PT |
23 |
CD |
|
|
tender |
557 |
Certification Set for Zoning, F.A.R. and Encroachment Drawings (4 of 4) |
26 Jun 86 - 30 Jun 86 |
Arch, Sd |
PT |
23 |
CD |
|
|
tender |
558 |
Stone Set Revisions of Office Tower and Vertical Transportation Diagrams |
n.d., 11 Jul 86 - 1 Dec 86 |
Arch |
PT |
51 |
CD |
|
|
|
560 |
Core Plan Drawings, Assorted Plans, and Sections (1 of 3) |
n.d., 28 Aug 86 - 1 Oct 87 |
Arch |
SP, PT |
23 |
CD |
|
|
|
561 |
Core Plan Drawings, Assorted Plans, and Sections (2 of 3) |
n.d., 28 Aug 86 - 1 Oct 87 |
Arch |
SP, PT |
23 |
CD |
|
|
|
562 |
Core Plan Drawings, Assorted Plans, and Sections (3 of 3) |
n.d., 28 Aug 86 - 1 Oct 87 |
Arch |
SP, PT |
23 |
CD |
|
|
|
563 |
Architectural Working Drawings of Galleria Design |
17 Oct 86 - 2 Jun 87 |
Arch |
SP, M |
42 |
CD |
|
|
|
568 |
Exterior Wall Treatment Drawings (1 of 2) |
1 Dec 86 - 8 May 87 |
Arch |
PT |
22 |
CD |
|
|
tender |
569 |
Exterior Wall Treatment Drawings (2 of 2) |
1 Dec 86 - 8 May 87 |
Arch |
PT |
22 |
CD |
|
|
tender |
570 |
Stone Package Drawings |
1 Dec 86 - 18 May 87 |
Arch |
PT |
36 |
CD |
|
|
office review |
571 |
Exterior Building Enclosure (1 of 2) |
1 Dec 86 - 21 Aug 87 |
Arch |
M, SP |
31 |
CD |
|
|
office review |
572 |
Exterior Building Enclosure (2 of 2) |
1 Dec 86 - 21 Aug 87 |
Arch |
M, SP |
32 |
CD |
|
|
office review |
573 |
Plans to Specify Paving Patterns (1 of 2) |
1 Dec 86 - 24 Dec 86 |
Arch, Sd |
M |
27 |
CD |
|
|
|
574 |
Plans to Specify Paving Patterns (2 of 2) |
1 Dec 86 - 24 Dec 86 |
Arch, Sd |
M |
27 |
CD |
|
|
|
575 |
Stone Package, Elevation and Section Drawings |
1 Dec 86 - 6 May 87 |
Arch |
PT |
19 |
CD |
|
|
|
579 |
Office Mock-Up Drawings |
10 Dec 86 |
Arch |
PT |
18 |
CD |
|
|
|
580 |
10 Columbus Circle Coordination Study and Preliminary Skylight Study |
15 Dec 86 - 23 Dec 86 |
Arch |
PT |
13 |
CD |
|
|
office review |
581 |
Architectural Working Drawings, Floor Plans |
15 Dec 86 |
Arch |
PT |
12 |
CD |
|
|
tender |
582 |
Architectural Working Drawings (1 of 3) |
15 Dec 86 |
Arch |
SP |
24 |
CD |
|
|
tender |
583 |
Architectural Working Drawings (2 of 3) |
15 Dec 86 |
Arch |
SP |
24 |
CD |
|
|
tender |
584 |
Architectural Working Drawings (3 of 3) |
15 Dec 86 |
Arch |
SP |
24 |
CD |
|
|
tender |
585 |
Architectural Working Drawings, Pricing Set (1 of 2) |
15 Dec 86 |
Arch |
SP |
22 |
CD |
|
|
tender |
586 |
Architectural Working Drawings, Pricing Set (2 of 2) |
15 Dec 86 |
Arch |
SP |
20 |
CD |
|
|
tender |
587 |
Apartment Layout Pricing Set (1 of 2) |
15 Dec 86 |
Arch |
SP |
25 |
CD |
|
|
tender |
588 |
Apartment Layout Pricing Set (2 of 2) |
15 Dec 86 |
Arch |
SP |
24 |
CD |
|
|
tender |
589 |
Pricing Set (1 of 2) |
15 Dec 86 |
Arch, Mech |
PT |
31 |
CD |
|
|
tender |
590 |
Pricing Set (2 of 2) |
15 Dec 86 |
Arch, Mech |
PT |
31 |
CD |
|
|
tender |
596 |
Core Plans and Partial Building Sections (1 of 2) |
5 Feb 87 |
Arch |
M |
18 |
CD |
|
|
|
597 |
Core Plans and Partial Building Sections (2 of 2) |
5 Feb 87 |
Arch |
M |
18 |
CD |
|
|
|
598 |
Core and Background Package (1 of 2) |
5 Feb 87 |
Arch |
PT |
49 |
CD |
|
|
office review |
599 |
Core and Background Package (2 of 2) |
5 Feb 87 |
Arch |
PT |
50 |
CD |
|
|
office review |
600 |
Drawings for Window Washing |
6 Feb 87 - 16 Feb 87 |
Arch |
PT |
17 |
CD |
|
|
|
602 |
Foundation Package (1 of 2) |
11 Feb 87 - 25 Jun 87 |
Arch, S |
PLTP, SP |
23 |
CD |
|
|
presentation |
603 |
Foundation Package (2 of 2) |
11 Feb 87 - 25 Jun 87 |
Arch, S |
PLTP, SP |
24 |
CD |
|
|
presentation |
604 |
Vertical Transportation Scope Drawings |
13 Feb 87 - 15 May 87 |
Arch |
M, SP |
21 |
CD |
|
|
office review |
605 |
Vertical Transportation Drawings (1 of 2) |
13 Feb 87 |
Arch |
PT |
25 |
CD |
|
|
office review |
606 |
Vertical Transportation Drawings (2 of 2) |
13 Feb 87 |
Arch |
PT |
26 |
CD |
|
|
office review |
607 |
Filing Set for Alterations of the N.Y. Coliseum |
15 Feb 87 |
Arch |
PT |
34 |
CD |
|
|
tender |
617 |
Foundation Package Drawings |
30 Mar 87 - 21 May 87 |
Arch, S |
PT |
41 |
CD |
|
|
tender |
618 |
Foundation Package Drawings (1 of 3) |
30 Mar 87 |
Arch, S |
PT |
25 |
CD |
|
|
office review |
619 |
Foundation Package Drawings (2 of 3) |
30 Mar 87 |
Arch, S |
PT |
25 |
CD |
|
|
office review |
620 |
Foundation Package Drawings (3 of 3) |
30 Mar 87 |
Arch, S |
PT |
26 |
CD |
|
|
office review |
621 |
Building Sections |
31 Mar 87 |
Arch |
Mix |
40 |
CD |
|
|
|
624 |
Exterior Building Enclosure Set |
1 Apr 87 - 12 Jun 87 |
Arch |
PT |
30 |
CD |
|
|
office review |
625 |
Theater Package Drawings |
21 April 87 |
Arch |
M, SP |
23 |
CD |
|
|
tender |
626 |
Theater Package, Sections |
21 Apr 87 - 5 May 87 |
Arch |
PT |
21 |
CD |
|
|
presentation |
628 |
Residential Design Plan Drawings (1 of 2) |
21 Apr 87 - 29 Apr 87 |
Arch |
SP |
24 |
CD |
|
|
|
629 |
Residential Design Plan Drawings (2 of 2) |
21 Apr 87 - 29 Apr 87 |
Arch |
SP |
22 |
CD |
|
|
|
634 |
Architectural Composite Set (1 of 6) |
1 May 87 |
Arch |
PT |
30 |
CD |
|
|
office review |
635 |
Architectural Composite Set (2 of 6) |
1 May 87 |
Arch |
PT |
30 |
CD |
|
|
office review |
636 |
Architectural Composite Set (3 of 6) |
1 May 87 |
Arch |
PT |
30 |
CD |
|
|
office review |
637 |
Architectural Composite Set (4 of 6) |
1 May 87 |
Arch |
PT |
30 |
CD |
|
|
office review |
638 |
Architectural Composite Set (5 of 6) |
1 May 87 |
Arch |
PT |
30 |
CD |
|
|
office review |
639 |
Architectural Composite Set (6 of 6) |
1 May 87 |
Arch |
PT |
28 |
CD |
|
|
office review |
641 |
Paving Studies and Main Lobby and Auto Drop-Off Package |
1 May 87 - 1 Jul 87 |
Arch, Sd |
PT |
35 |
CD |
|
|
office review |
642 |
Wall Sections and Details and Atrium and Glazing Studies (1 of 2) |
1 May 87 - 18 Aug 87 |
Arch |
Mix |
16 |
CD |
|
|
|
643 |
Walls Sections and Details and Atrium and Glazing Studies (2 of 2)
|
1 May 87 - 18 Aug 87 |
Arch |
Mix |
8 |
CD |
|
|
|
644 |
Lighting Design Drawings (1 of 4) |
1 May 87 - 24 Aug 87 |
Arch |
Mix |
29 |
CD |
|
|
|
645 |
Lighting Design Drawings (2 of 4) |
1 May 87 - 24 Aug 87 |
Arch |
Mix |
30 |
CD |
|
|
|
646 |
Lighting Design Drawings (3 of 4) |
1 May 87 - 24 Aug 87 |
Arch |
Mix |
30 |
CD |
|
|
|
647 |
Lighting Design Drawings (4 of 4) |
1 May 87 - 24 Aug 87 |
Arch |
Mix |
30 |
CD |
|
|
|
656 |
Galleria Pier Study |
2 Jun 87 |
Arch |
PT |
39 |
CD |
|
|
presentation |
657 |
Curtain Wall Pricing Set |
8 Jun 87 |
Arch |
PT |
29 |
CD |
|
|
tender |
658 |
Elevational Drawings for Pricing Set |
8 Jun 87 |
Arch |
PT |
27 |
CD |
|
|
tender |
659 |
Glazing Pricing Set |
8 Jun 87 |
Arch |
SP |
29 |
CD |
|
|
tender |
661 |
Steel Stair Bid Package (1 of 5) |
26 Jun 87 |
Arch |
PT |
29 |
CD |
|
|
tender |
662 |
Steel Stair Bid Package (2 of 5) |
26 Jun 87 |
Arch |
PT |
29 |
CD |
|
|
tender |
663 |
Steel Stair Bid Package (3 of 5) |
26 Jun 87 |
Arch |
PT |
29 |
CD |
|
|
tender |
664 |
Steel Stair Bid Package (4 of 5) |
26 Jun 87 |
Arch |
PT |
30 |
CD |
|
|
tender |
665 |
Steel Stair Bid Package (5 of 5) |
26 Jun 87 |
Arch |
PT |
28 |
CD |
|
|
tender |
675 |
Atrium Garden and Site Work Pricing Sets |
1 Jul 87 - 21 Sept 87 |
Arch, Sd |
PT |
32 |
CD |
|
|
tender |
676 |
Lobby Finishes Pricing Set |
1 Jul 87 - 21 Sept 87 |
Arch |
PT |
28 |
CD |
|
|
tender |
678 |
Stone Package |
1 Jul 87 - 13 Oct 87 |
Arch |
Mix |
31 |
CD |
|
|
|
681 |
Reflected Ceiling Plans |
18 Aug 87 |
Arch |
M |
16 |
CD |
|
|
|
682 |
Architectural Working Drawings (1 of 4) |
4 Sept 87 |
Arch |
PT |
27 |
CD |
|
|
|
683 |
Architectural Working Drawings (2 of 4) |
4 Sept 87 |
Arch |
PT |
26 |
CD |
|
|
|
684 |
Architectural Working Drawings (3 of 4) |
4 Sept 87 |
Arch |
PT |
26 |
CD |
|
|
|
685 |
Architectural Working Drawings (4 of 4) |
4 Sept 87 |
Arch |
PT |
27 |
CD |
|
|
|
686 |
Architectural Working Drawings of Residential Units Floor Plans (1 of 2) |
4 Sept 87 |
Arch |
SP |
50 |
CD |
|
|
|
687 |
Architectural Working Drawings of Residential Units Floor Plans (2 of 2) |
4 Sept 87 |
Arch |
SP |
54 |
CD |
|
|
|
688 |
Residential Unit Drawings, Complete Check Set (1 of 3) |
4 Sept 87 |
Arch |
PT |
35 |
CD |
|
|
office review |
689 |
Residential Unit Drawings, Complete Check Set (2 of 3) |
4 Sept 87 |
Arch |
PT |
35 |
CD |
|
|
office review |
690 |
Residential Unit Drawings, Complete Check Set (3 of 3) |
4 Sept 87 |
Arch |
PT |
36 |
CD |
|
|
office review |
691 |
Residential Unit Floor Plans (1 of 2) |
4 Sept 87 |
Arch |
M |
15 |
CD |
|
|
|
692 |
Residential Unit Floor Plans (2 of 2) |
4 Sept 87 |
Arch |
M |
16 |
CD |
|
|
|
693 |
Residential Unit Drawings (1 of 2) |
4 Sept 87 |
Arch |
M |
21 |
CD |
|
|
|
694 |
Residential Unit Drawings (2 of 2) |
4 Sept 87 |
Arch |
M |
22 |
CD |
|
|
|
695 |
Architectural Working Drawings of Office Space (1 of 3) |
14 Sept 87 |
Arch |
M |
22 |
CD |
|
|
tender |
696 |
Architectural Working Drawings, Office Space (2 of 3) |
14 Sept 87 |
Arch |
M |
23 |
CD |
|
|
tender |
697 |
Architectural Working Drawings, Office Space (3 of 3) |
14 Sept 87 |
Arch |
M |
23 |
CD |
|
|
tender |
698 |
Drawings of Office Space (1 of 3) |
14 Sept 87 |
Arch |
M |
22 |
CD |
|
|
|
699 |
Drawings Office Space (2 of 3) |
14 Sept 87 |
Arch |
M |
23 |
CD |
|
|
|
700 |
Drawings Office Space (3 of 3) |
14 Sept 87 |
Arch |
M |
23 |
CD |
|
|
|
701 |
Issued for Pricing; Galleria and Retail Architectural Working Drawings |
17 Sept 87 - 5 Oct 87 |
Arch |
M |
23 |
CD |
|
|
tender |
702 |
Issued for Pricing; Galleria and Retail Architectural Working Drawings |
17 Sept 87 - 20 Oct 87 |
Arch |
M |
29 |
CD |
|
|
tender |
703 |
Subway Finishes Pricing Package |
21 Sept 87 |
Arch |
PT |
15 |
CD |
|
|
tender |
704 |
Subway Finishes Pricing Package and Retail Passenger Elevator Cab (1 of 2) |
21 Sept 87 |
Arch |
M |
15 |
CD |
|
|
tender |
705 |
Subway Finishes Pricing Package and Retail Passenger Elevator Cab (2 of 2) |
21 Sept 87 |
Arch |
M |
14 |
CD |
|
|
tender |
706 |
Atrium Garden, Subway Finishes Pricing Set (1 of 3) |
21 Sept 87 |
Arch |
SP |
25 |
CD |
|
|
tender |
707 |
Atrium Garden, Subway Finishes Pricing Set (2 of 3) |
21 Sept 87 |
Arch |
SP |
26 |
CD |
|
|
tender |
708 |
Atrium Garden, Subway Finishes Pricing Set (3 of 3) |
21 Sept 87 |
Arch |
SP |
24 |
CD |
|
|
tender |
709 |
Pricing Set; Galleria and Lobby Finishes, and Site Crescent (1 of 3) |
21 Sept 87 - 5 Oct 87 |
Arch, Sd |
SP, M |
20 |
CD |
|
|
tender |
710 |
Pricing Set; Galleria and Lobby Finishes, and Site Crescent (2 of 3) |
21 Sept 87 - 5 Oct 87 |
Arch, Sd |
SP, M |
33 |
CD |
|
|
tender |
711 |
Pricing Set; Galleria and Lobby Finishes, and Site Crescent (3 of 3) |
21 Sept 87 - 5 Oct 87 |
Arch, Sd |
SP, M |
18 |
CD |
|
|
tender |
712 |
Main Lobby and Auto Drop-Off Pricing Set |
28 Sept 87 |
Arch |
PT |
19 |
CD |
|
|
tender |
713 |
Galleria Finishes Pricing Package (1 of 3) |
28 Sept 87 |
Arch |
SP |
19 |
CD |
|
|
tender |
714 |
Galleria Finishes Pricing Package (2 of 3) |
28 Sept 87 |
Arch |
SP |
26 |
CD |
|
|
tender |
715 |
Galleria Finishes Pricing Package (3 of 3) |
28 Sept 87 |
Arch |
SP |
23 |
CD |
|
|
tender |
716 |
Issued for Pricing; Galleria and Retail Architectural Drawings (1 of 2) |
28 Sept 87 - 20 Oct 87 |
Arch |
M |
19 |
CD |
|
|
tender |
717 |
Issued for Pricing; Galleria and Retail Architectural Drawings (2 of 2) |
28 Sept 87 - 20 Oct 87 |
Arch |
M |
19 |
CD |
|
|
tender |
718 |
Issued for Pricing; Galleria and Retail Architectural Working Drawings |
28 Sept 87 - 20 Oct 87 |
Arch |
M |
24 |
CD |
|
|
tender |
721 |
Skylight Pricing Set |
5 Oct 87 |
Arch |
SP |
13 |
CD |
|
|
tender |
722 |
F.A.R. Massing and Core Studies, Architectural Working Drawings |
7 Oct 87 - 9 Nov 87 |
Arch |
Mix |
43 |
CD |
|
|
|
723 |
F.A.R. Massing and Core Studies (2 of 2) |
10 Oct 87 - 9 Nov 87 |
Arch |
Mix |
40 |
CD |
|
|
|
737 |
Office Plumbing Bid Set (1 of 2) |
10 Jun 87 |
P |
PT |
66 |
CD |
|
|
tender |
738 |
Office Plumbing Bid Set (2 of 2) |
10 Jun 87 |
P |
PT |
65 |
CD |
|
|
tender |
744 |
Plumbing and Fire Protection Drawings, Foundation-Level S39 - N39 (1 of 5) |
22 Jun 87 |
P |
PT |
24 |
CD |
|
|
tender |
745 |
Plumbing and Fire Protection Drawings, Foundation-Level S39 - N39 (2 of 5) |
22 Jun 87 |
P |
PT |
24 |
CD |
|
|
tender |
746 |
Plumbing and Fire Protection Drawings, Foundation-Level S39 - N39 (3 of 5) |
22 Jun 87 |
P |
PT |
24 |
CD |
|
|
tender |
747 |
Plumbing and Fire Protection Drawings, Foundation-Level S39 - N39 (4 of 5) |
22 Jun 87 |
P |
PT |
24 |
CD |
|
|
tender |
748 |
Plumbing and Fire Protection Drawings, Foundation-Level S39 - N39 (5 of 5) |
22 Jun 87 |
P |
PT |
25 |
CD |
|
|
tender |
749 |
Plumbing Bid Drawings |
22 Jun 87 |
P |
PT |
12 |
CD |
|
|
tender |
750 |
Residential Plumbing Bid Drawings (1 of 2) |
15 Jul 87 |
P |
PT |
21 |
CD |
|
|
tender |
751 |
Residential Plumbing Bid Drawings (2 of 2) |
15 Jul 87 |
P |
PT |
23 |
CD |
|
|
tender |
758 |
Mechanical System Drawings (1 of 2) |
15 Jan 87 - 9 Feb 87 |
Mech |
PT |
31 |
CD |
|
|
tender |
759 |
Mechanical System Drawings (2 of 2) |
15 Jan 87 - 9 Feb 87 |
Mech |
PT |
36 |
CD |
|
|
tender |
779 |
Office HVAC Bid Set |
10 Jun 87 - 22 Jun 87 |
Mech |
PT |
24 |
CD |
|
|
tender |
780 |
HVAC Sub-Cellar Bid Documents (1 of 5) |
22 Jun 87 |
Mech |
PT |
24 |
CD |
|
|
tender |
781 |
HVAC Sub-Cellar Bid Documents (2 of 5) |
22 Jun 87 |
Mech |
PT |
25 |
CD |
|
|
tender |
782 |
HVAC Sub-Cellar Bid Documents (3 of 5) |
22 Jun 87 |
Mech |
PT |
25 |
CD |
|
|
tender |
783 |
HVAC Sub-Cellar Bid Documents (4 of 5) |
22 Jun 87 |
Mech |
PT |
25 |
CD |
|
|
tender |
784 |
HVAC Sub-Cellar Bid Documents (5 of 5) |
22 Jun 87 |
Mech |
PT |
25 |
CD |
|
|
tender |
786 |
Theater Coordination Drawings for Mechanical, Plumbing, and Electrical |
1 Jul 87 |
Mech, P |
PT |
40 |
CD |
|
|
tender, office review |
787 |
Residential HVAC Bid Documents (1 of 2) |
15 Jul 87 |
Mech |
Mix |
20 |
CD |
|
|
tender |
788 |
Residential HVAC Bid Documents (2 of 2) |
15 Jul 87 |
Mech |
Mix |
20 |
CD |
|
|
tender |
797 |
Residential Electrical (1 of 5) |
n.d., 22 Jun 87 - 15 Jul 87 |
Elec |
M |
22 |
CD |
|
|
tender |
798 |
Residential Electrical (2 of 5) |
n.d., 22 Jun 87 - 15 Jul 87 |
Elec |
M |
22 |
CD |
|
|
tender |
799 |
Residential Electrical (3 of 5) |
n.d., 22 Jun 87 - 15 Jul 87 |
Elec |
M |
22 |
CD |
|
|
tender |
800 |
Residential Electrical (4 of 5) |
n.d., 22 Jun 87 - 15 Jul 87 |
Elec |
M |
24 |
CD |
|
|
tender |
801 |
Residential Electrical (5 of 5) |
n.d., 22 Jun 87 - 15 Jul 87 |
Elec |
M |
22 |
CD |
|
|
tender |
806 |
Retail Galleria and Public Bid Documents, Electrical Drawings (1 of 3) |
1 Jul 87 |
Elec |
PT, PHC |
26 |
CD |
|
|
tender |
807 |
Retail Galleria and Public Bid Documents, Electrical Drawings (2 of 3) |
1 Jul 87 |
Elec |
PT, PHC |
26 |
CD |
|
|
tender |
808 |
Retail Galleria and Public Bid Documents, Electrical Drawings (3 of 3) |
1 Jul 87 |
Elec |
PT, PHC |
24 |
CD |
|
|
tender |
809 |
Residential Security (1 of 2) |
15 Jul 87 |
Elec |
M |
19 |
CD |
|
|
tender |
810 |
Residential Security (2 of 2) |
15 Jul 87 |
Elec |
M |
20 |
CD |
|
|
tender |
811 |
Residential Security (1 of 2) |
15 Jul 87 |
Elec |
PT |
20 |
CD |
|
|
tender |
812 |
Residential Security (2 of 2) |
15 Jul 87 |
Elec |
PT |
19 |
CD |
|
|
tender |
813 |
Scope Demolition Package |
n.d., 6 Oct 86 - 14 Apr 87 |
Dem |
M |
22 |
CD |
office review |
yes |
office review |
814 |
Environmental Impact Studies |
n.d., 26 Feb - 24 Nov 86 |
Sd |
Mix |
37 |
SD |
|
|
|
815 |
Shadow Studies |
n.d., 29 Jan - 17 Aug 87 |
Sd |
Mix |
93 |
SD |
|
|
|
816 |
Construction Detail and Reference Drawings - Curtain Wall |
28 Oct 83 - 29 Apr 87 |
Arch, Ref |
PT |
121 |
CD |
|
|
|
817 |
New York Coliseum - Columbus Circle Proposal for Purchase: East Elevation; Site Plan And Traffic Concept Plan |
n.d. |
Arch |
PT |
2 |
|
|
|
|
818 |
Consultant Drawings (Protoypical Layouts, Preliminary Framing Plan, Proposed SBI Lobby Concepts, Signage); Assorted Plans; Massing Schemes; Perspective |
n.d., 2 Oct 85 - 6 Jul 87 |
Arch |
Mix |
16 |
|
|
|
|
819 |
Original Moshe Safdie sketches and elevations; coloured pencil on trace mounted on board |
Oct 86 |
Arch |
TP |
4 |
SD |
|
|
|
820 |
Artist renderings; coloured pencil on print mounted on board |
n.d. |
Arch |
PT |
2 |
SD |
|
|
|
821 |
Elevations (unknown artist); coloured pencil on print |
n.d. |
Arch |
PT |
4 |
SD |
|
|
|
822 |
Interior rendering and atrium section (unknown artist); coloured pencil and ink on vellum |
n.d. |
Arch |
V |
2 |
SD |
|
|
|
823 |
Renderings by artist "OLES"?; pencil on vellum, mounted on board |
13 Mar 86 |
Arch |
V |
3 |
SD |
|
|
|
824 |
Atrium perspective (unknown artist); coloured pencil on board |
n.d. |
Arch |
|
1 |
SD |
|
|
|