Folder No. |
Title |
Dates |
Drawing Type |
Medium |
Drawings |
Project Phase |
Set Description |
Set Designation |
Set Type |
|
1 |
Reference Drawings: Austrian National Gallery; Museum of Modern Art; Smithsonian |
74-75 |
Ref |
PT |
38 |
PP |
|
|
|
2 |
Plans: AGO; Walker Art Center; Hood Museum of Art, Dartmouth |
75-76 |
Ref |
PT |
9 |
PP |
|
|
|
3 |
Plans: Unidentified Museums; Portland Museum of Art; Museum of Kimball Art Foundation, Fort Worth, Texas |
n.d. |
Ref |
PT |
15 |
PP |
|
|
|
4 |
Plans: Library of Parliament; War Museum; Embassy Office Building of the US, Notre Dame de Sacre Coeur Convent (Chapelle); unidentified church |
n.d. |
Ref |
PT |
49 |
PP |
|
|
|
5 |
Existing Site Conditions |
Feb 83 - Mar 83 |
ExCon |
PT |
5 |
PP |
|
|
|
6 |
Site Analysis, Site Studies |
Feb 83 - Mar 83 |
Sd, Arch |
PT |
11 |
PP |
|
|
|
7 |
Traffic Circulation Studies |
Feb 83 - Mar 83 |
Sd, Arch |
Mix |
13 |
PP |
|
|
|
8 |
Original site plans by Moshe Safdie; pastel and charcoal on yellow trace |
83 |
Arch |
TP |
2 |
SD |
|
|
|
8 |
Plans and building sections |
83 |
Arch |
Mix |
27 |
SD |
|
|
|
8 |
Colour print |
83 |
Arch |
PHPT |
1 |
SD |
|
|
|
9 |
Assorted Building Sections: Tracings, Drawings |
83 |
Arch |
V |
23 |
SD |
|
|
|
10 |
Plans, Space/Area Calculations |
Feb 83 - Mar 83 |
Arch |
PT, V |
12 |
SD |
|
|
|
11 |
Exhibition Material; Elevations by Moshe Safdie |
Feb 83 - Mar 83 |
Arch |
PT, V |
12 |
SD |
|
|
|
11 |
Exhibition Material; Sketch reproductions on mylar by Michael Guran |
Feb 83 - Mar 83 |
Arch |
M |
6 |
SD |
|
|
|
11 |
Exhibition Material; original Moshe Safdie sketch; oil pastel on trace, unsigned |
Feb 83 - Mar 83 |
Arch |
TP |
1 |
SD |
|
|
|
11 |
Exhibition Material; original sketch by Moshe Safdie; charcoal on yellow trace |
Feb 83 - Mar 83 |
Arch |
TP |
1 |
|
|
|
|
11 |
Exhibition Material; original sketch by Moshe Safdie on yellow trace |
Feb 83 - Mar 83 |
Arch |
TP |
4 |
SD |
|
|
|
13 |
Schematic Design: Section Drawings A-F, Elevations A-F, Schemes 1-4 |
08 May 83 |
Arch |
SP |
17 |
SD |
|
|
presentation |
14 |
Plans at Different Levels e.g. Upper Level, Mezzanine, Parking, Space |
22 May 83 |
Arch |
Mix |
21 |
SD |
|
|
presentation |
15 |
Schematic Design Set: Entrances, Gallery Study - Case Layout |
Jun 83, Jun 84 |
Arch |
Mix |
3 |
SD |
|
|
presentation |
16 |
Design Process: Preliminary Schedule of NGC, Preliminary Section Studies |
24 Jun 83 |
Arch |
Mix |
11 |
SD |
|
|
|
17 |
Gallery Layout-Assorted Drawings for Model Construction: Special European Gallery and Assorted Mix; European and American Gallery; Canadian, European and American Gallery |
21 Jun 83 - 12 Aug 83 |
Arch |
V |
13 |
SD |
|
|
|
18 |
Design Studies: Auditorium Section |
Feb 84 |
Arch |
Mix |
2 |
SD |
|
|
|
19 |
Continental Gallery Building Modules and Column Location: Contemporary Gallery - Typical Sections |
14 Jul 83 - 08 Dec 83 |
Arch |
Mix |
13 |
SD |
|
|
|
22 |
Presentation Set - Courtyards: East, West, War Memorial, Canadian, European and American, Elevations, Sections, Schemes 2,3,4 |
31 Oct 84 |
Arch |
Mix |
29 |
DD |
|
|
presentation |
23 |
Camera-Ready Presentation Set |
31 Oct 83 |
Arch |
M, SLK |
18 |
SD |
|
|
|
24 |
Mylar Design Development Presentation Set |
31 Oct 83 |
Arch |
M |
24 |
SD |
|
|
presentation |
25 |
View Studies, Circulation Patterns, Site Plans |
11 May 84 - 13 Nov 84 |
Sd |
Mix |
7 |
DD |
|
|
|
26 |
Landscape Drawings: Sketches, Plant Material; Ceremonial Route; Basilica Gallery Node (see also Folders 27, 103, 105) |
Feb 86 - Apr 86 |
Sd |
Mix |
16 |
DD |
|
|
|
27 |
Landscape Drawings and Studies including Planting and Irrigation, Grading and Paving (see also Folders 26, 103, 105) |
13 Aug 86 - 30 May 87 |
Sd |
Mix |
36 |
DD |
tender |
yes |
tender |
29 |
Design Studies for Parking Garage Concepts: Entrance Ramps, Parking Levels, Loading Dicks, Trucking Level |
9 Nov 83 - 84 |
Arch |
Mix |
18 |
DD |
|
|
|
30 |
Design Studies: Colonade, Rotunda |
83-84 |
Arch |
PT |
7 |
DD |
|
|
|
31 |
Design Studies: Bay Windows-Library, Terrace Restaurant, Future Summer Entrance |
05 January 84 |
Arch |
Mix |
13 |
DD |
|
|
|
32 |
Design Studies: Lower and Upper Parking Levels, Mezzanine and Main Gallery Level Studies |
09 January 84 |
Arch |
Mix |
22 |
DD |
|
|
|
33 |
Design Development Phase: European and American Galleries, Publication Level, Planning and Design for Library |
25 January 84 |
Arch |
Mix |
14 |
DD |
|
|
|
34 |
Assorted Design Development Drawings (1 of 2) - Levels: Main, Mezzanine, Trucking, Service, Conservation, PDP, Administration; Elevation; Sections; Coursing Study |
04 February 84 |
Arch |
SP, V |
27 |
DD |
|
|
|
35 |
Assorted Design Development Drawings (2 of 2): Daylight System Study; Skylight; Light Slot; Track |
84, 86, 87 |
Arch |
PT |
14 |
DD |
|
|
|
36 |
Assorted Design Development Drawings (1 of 2): Modern and Contemporary Galleries; Roof Plan, Skylight, Sections, etc |
Mar 84 |
Arch |
Mix |
26 |
DD |
|
|
|
37 |
Assorted Design Development Drawings (2 of 2): Office Building: Level (East, West Ends), Elevations; Nepean Point Elevation |
27 Mar 84 |
Arch |
Mix |
14 |
DD |
|
|
|
40 |
Assorted Design Development Drawings (1 of 2): West Court; Ramped Colonade Plan; Shading Study - Roof Plan, West Elevation, South; Special European Gallery (Sections); Tour Group Lobby (Column Layout) |
01 May 84 |
Arch |
Mix |
14 |
DD |
|
|
|
42 |
Assorted Design Development Drawings (1 of 2): Railing and Bulstrade Sections, Bay Window Lunch Room, European Galleries, South Elevation, Section Through Rotunda, Galleria Sections |
Jun 84 |
Arch |
Mix |
21 |
DD |
|
|
|
43 |
Assorted Design Development Drawings (2 of 2): Entry Hall Plan and Studies, Building Section - a Lighting Study, Office Wing Board Room, Great Hall Floor, Roof, Paving Plans |
Jun 84 |
Arch |
Mix |
21 |
DD |
|
|
|
44 |
Assorted Design Development Drawings (1 of 3): Sections AA-EE; Skylights, End Wall Condition; Lighting Studies; Asian Artifact Exhibit Case; Sketches |
Jul 84 |
Arch |
Mix |
17 |
DD |
|
|
|
45 |
Assorted Design Development Drawings (2 of 3): Office Layouts at Levels 61.80, 65.80, 70.55, 74.55 for Secretarial, Curator, etc. |
20 Jul 84 |
Arch |
Mix |
31 |
DD |
|
|
|
46 |
Assorted Design Development Drawings (3 of 3): Ceiling Plans, Sections to Relocate Lighting, Necks, Entrance Hall, Connection Roof Plan, Tours Group Entry Plans, Group Entrance |
Jul 84 |
Arch |
Mix |
11 |
DD |
|
|
|
47 |
Administration Building and Administration Wing |
Aug 84 |
Arch |
Mix |
7 |
DD |
|
no |
|
48 |
Great Hall Design Development Drawings: Stairs, Mullion Proposals, Framing Section |
Aug 84 |
Arch |
Mix |
18 |
DD |
|
|
|
49 |
Assorted Design Development Drawings: Amphitheatre, Plaza Plan, Entrance Ramps, North Elevation |
15 Aug 84 - Nov 84 |
Arch |
Mix |
7 |
DD |
|
|
|
50 |
Assorted Design Development Drawings: Includes Patterns, Staff Entrance, Board Room, Director's Office |
13 Jan 85 |
Arch |
Mix |
22 |
DD |
|
|
|
51 |
Assorted Design Development Drawings (1 of 2): Paving Patterns; Great Hall Blinds; Angles; Queue Diffuser Studies |
86 - 87 |
Arch |
Mix |
15 |
DD |
|
|
|
52 |
Assorted Design Development Drawings (2 of 2): Layouts: Lunch Room, Cloak Room, Children's Book Store (Sketches); Ceiling Plans; Special European/American Galleries; Landscaping; Architrave and Cameras; Rooms - Lecture, Orientation, Activity, Seminar |
86 - 87 |
Arch |
Mix |
25 |
DD |
|
|
|
53 |
Lighting Fixture Details: Lighting Fixture Schedules Jan 86 ; Skylight Study (A556-560) |
29 Jan 85 |
Elec, Arch |
Mix |
13 |
DD |
|
|
|
54 |
Exterior Site Services Tender |
15 Aug 84 |
Sd |
PT |
18 |
CD |
tender |
yes |
tender |
56 |
Structural Set: Framing Plans, Column Schedules, Beam Reinforcing Schedules, Foundation Section, Elevation S101-106, 108-112, 114-121 |
22 Jun 84 |
Arch |
PT |
25 |
CD |
|
|
|
57 |
Programming and Planning: Average and Maximum Occupancy Loads; Space Analysis Drawings; Headroom Clearance |
15 Dec 84 |
Arch |
Mix |
17 |
DD |
|
|
|
60 |
Revised Structural Drawings: Construction: Framing Plans, Column and Flooring Schedule, Reinforcing, Sections, Elevations, Floor Plans, Beam Reinforcing Schedule S201-217, 219-232 |
09 Aug 85 |
S |
PT |
29 |
CD |
tender |
yes |
Masonry Tender |
61 |
Revised Structural Drawings: Foundation Plans, Framing Plans, Column and Flooring Schedules, Sections; Reinforcing S301-309, 311-318, 320-353, 355-361 |
09 Aug 85 |
S |
PT |
56 |
CD |
tender |
yes |
Tender |
64 |
Revised Structural Drawings Typical Details; Sections, Programming Plans, Framing Plans, Beam Schedules, Precast Concrete Details, Foundation Plans S401-433, 435, 440-444 |
09 Aug 85 |
S |
PT |
38 |
CD |
|
|
tender |
65 |
Stairs and Exit Stairs |
n/d |
S |
Mix |
29 |
CD |
|
|
|
67 |
Columns |
12 Aug 92 |
S |
Mix |
36 |
CD |
|
|
|
68 |
Concrete Remedial Wall Package |
12 Aug 92 |
S |
M |
29 |
CD |
|
|
|
69 |
Millwork Tender - Furniture File |
86, 87 |
|
M |
28 |
DD |
|
|
|
70 |
Stainless Steel Handrail for Galleria |
88 |
|
Mix |
4 |
DD |
|
|
|
74 |
Air and Water Balancing Contract |
84 |
TB |
PT |
18 |
CD |
|
|
|
75 |
Interior Stainless Steel Doors Detail |
85 |
|
PT |
60 |
|
|
|
|
76 |
Tour Group Pavilion: Plans Elevation |
n/d |
|
|
4 |
|
|
|
|
77 |
Millwork Tender - Security Desk |
87, 88 |
|
Mix |
4 |
CD |
|
|
|
78 |
Air Conditioning |
83 |
|
PT |
12 |
CD |
|
|
|
82 |
As Built 1985: Construction Detail Drawings - Wall Construction 5006-5010, 5012, 5013, 5015, 5016, 5018, 5019 |
05 Jul 85 |
S, Arch |
V |
11 |
CD |
as-built |
yes |
As-Built |
85 |
TUBE - Site Plan Drawings |
n/d |
|
M |
2 |
|
|
|
|
86 |
TUBE - Sections/Elevations Drawings |
n/d |
|
M |
2 |
|
|
|
|
87 |
TUBE - PDP Studies: Main Upper Gallery, Publications, Parking Level, etc. |
83 |
|
PT |
5 |
|
|
|
|
88 |
TUBE - Parking Concepts Drawings |
83 |
|
PT |
6 |
|
|
|
|
93 |
Concrete Placement PWD 96, A112, 168, 168A, 264-266 |
30 May 84 |
Arch |
PT |
17 |
CD |
|
|
|
94 |
Land Surveys and Traffic Construction |
Sep 83 |
ExCon |
PT |
10 |
PP |
|
|
|
95 |
Topographical Information |
Mar 87 |
ExCon |
M |
9 |
DD |
|
|
|
97 |
Axonometric Drawings - Galleries: Main, Upper |
Oct 83 |
|
Mix |
5 |
SD |
|
|
|
98 |
Skylight Heat Tracings |
Nov 90 |
|
Mix |
13 |
SD |
|
|
|
99 |
Arch Lighting Design: Skylight Framing Plans; Proposed Lighting Presentation '84, Daylight System Study '84, Track Lighting Study '86 (Jules Fisher & Paul Marantz) |
84, 86 |
|
PT |
24 |
SD |
|
|
|
100 |
Skylight Remedial Work (D A Caulfield Presentation '93) |
90, 93 |
|
Mix |
46 |
|
|
|
|
101 |
Galleries: Special Exhibitions, Asian |
87, 88 |
|
Mix |
40 |
|
|
|
|
102 |
D A Caulfield Presentations (89, 90, 91) of Galleries, Lighting, Administration Building, Skylight, Banner Poles, etc. |
85, 89, 90, 91 |
|
Mix |
95 |
|
|
|
|
103 |
Cornelia Oberlander Presentation Drawings for Landscaping (see also Folders 26, 27, 105) |
84, 86, 87 |
|
PT |
18 |
|
|
|
|
104 |
Tracings: Site Plan, Administration Building, Lunch Room (Student); Windows, Visual Drawings of NGC |
89 |
Arch |
Mix |
56 |
|
|
|
|
105 |
Landscape Details - Structural, Mechanical, Electrical (see also Folders 26, 27, 103) |
86, 87 |
Arch |
PT |
12 |
|
|
|
|
106 |
Reflected Ceiling Plans |
87 |
Arch |
Mix |
42 |
|
|
|
|
107 |
Canadian Gallery |
87 |
Arch |
Vellum |
7 |
DD |
|
|
|
109 |
Design Studies: Building Sections, Elevation, Grids; Core Area Plan and Entrance Hall, Mezzanine |
83, 84 |
|
Mix |
21 |
SD |
|
|
|
110 |
Masonry: Stone Work, Granite Veneer (Granicor Drawings) |
85 |
Arch |
PT |
6 |
CD |
|
|
|
111 |
Wellington St. Site Plan Competition Entry |
|
|
PT |
20 |
DD |
|
|
|
112 |
Windows: Detailed Drawings, Sunshades/Roller Blinds |
84, 85 |
Arch |
PT |
13 |
|
|
|
|
126 |
Weeper and Underslab Drainage |
29 Oct 84 |
Arch, S |
PT |
3 |
CD |
|
|
office review |
140 |
Assorted Fit-Up Drawings |
25 Aug 87 - 26 Oct 87 |
Arch, I, S |
PT |
12 |
CD |
|
|
|
142 |
Bookstore Interiors and Arcade |
8 Jun 87 - 30 Nov 87 |
I |
SP |
22 |
CD |
|
|
tender |
143 |
Final Set Fit-Up Cases and Bases (1 of 3) |
24 Sept 87 - 11 Feb 88 |
I |
SP |
26 |
CD |
|
|
|
144 |
Final Set Fit-Up Cases and Bases (2 of 3) |
24 Sept 87 - 11 Feb 88 |
I |
SP |
30 |
CD |
|
|
|
145 |
Final Set Fit-Up Cases and Bases (3 of 3) |
24 Sept 87 - 11 Feb 88 |
I |
SP |
34 |
CD |
|
|
|
146 |
Restaurant Details and Food Services, Equipment; Kitchen Services Shop Drawings |
16 Dec 87 |
Mech |
PT |
20 |
CD |
|
|
|
147 |
Base Drawings with Romanesque Capitals |
26 Oct 87 |
I |
PT, 1/2 size |
26 |
CD |
|
|
|
148 |
Library Interior In-Progress (Adamson Industrial Design) |
30 Nov 87 |
I |
SP |
48 |
CD |
|
|
|
149 |
Restaurant Renovation - Revised Lunch Room Layout |
Apr 94 |
|
PT |
18 |
AD |
|
|
|
151 |
Fire Detection Construction Set: Fire Detection/Protection Separation FP 000's, 100's, 200's |
85-86 |
P |
PT |
34 |
CD |
|
|
|
152 |
Fire Protection/Detection/Construction, FP Drawings 300's, 400's, 1000's |
85-86 |
P |
PT |
23 |
CD |
|
|
|
153 |
Sleeving and Drainage |
17 Sept 84 |
Mech |
PT |
8 |
CD |
|
|
|
154 |
Gas Detection M173-178 |
15 Jun 84 |
Mech |
PT |
6 |
CD |
|
|
|
155 |
Thermostat Locations; Vent and Air Conditioning M2117, 2127,2137,2140, 2183-2186, M689 |
86-87 |
Mech |
PT |
11 |
CD |
tender |
yes |
tender |
156 |
Mechanical Tender Complete Set: Drawings 100's, 200's, 300's, 400's, 1000's |
17 Dec 86 |
Mech |
PT |
84 |
CD |
|
|
|
159 |
Sawyer's Drawings - Mechanical |
21 Jan 86 |
Shp |
PT |
42 |
CD |
office review |
yes |
office review |
160 |
Complete Set Interiors Tender: A000-008, 011-017, 020-026 (1 of 6) |
86, 87 |
Arch |
M |
23 |
CD |
|
|
|
161 |
Complete Set Interiors Tender: A030-047, 050-059 (2 of 6) |
86 |
Arch |
M |
28 |
CD |
|
|
|
162 |
Complete Set Interiors Tender: A060-062, 064-082, 084-088, 090-092, 094, 095 (3 of 6) |
87 |
Arch |
M |
31 |
CD |
|
|
|
163 |
Complete Set Interiors Tender: A101-111, 201-211 (4 of 6) |
86, 87 |
Arch |
M |
22 |
CD |
|
|
|
164 |
Complete Set Interiors Tender: A301-309, 401-409, 420, 421, 550-552 (5 of 6) |
86, 87 |
Arch |
M |
23 |
|
|
|
|
165 |
Complete Set Interiors Tender: A601-625, 627-632, 635 (6 of 6) |
86, 87 |
Arch |
M |
33 |
CD |
|
|
|
166 |
Interiors Tender: A002 Insulation; A004, 006 Floor; A006,007 Monorail; A001-006 Exit |
86, 87 |
Arch |
M |
11 |
CD |
|
|
|
171 |
Electrical Tender as Built E004AB - 403AB |
30 Apr 85 |
Elec |
PT |
49 |
CD |
tender |
yes |
Tender |
176 |
Electrical Construction Set E000's - 100's (1 of 3) |
31 May 85 |
Elec |
PT |
40 |
CD |
|
|
|
177 |
Electrical Construction Set E200's (2 of 3) |
21 Aug 85 |
Elec |
PT |
16 |
CD |
tender |
yes |
tender |
178 |
Electrical Construction Set E300's, 400's (3 of 3) |
21 Aug 85 |
Elec |
PT |
25 |
CD |
tender |
yes |
tender |
179 |
Electrical Fit-Up Drawings |
14 Aug 84 |
Elec, I |
PT |
14 |
CD |
|
|
|
181 |
Elevator Shop Drawings |
84 |
Shp |
PT |
45 |
CA |
|
|
|
182 |
Lightoiler Shop Drawings |
12 Apr 85 |
Shp |
PT |
12 |
CA |
|
|
|
183 |
Site Sections |
n.d. |
Arch |
M |
2 |
|
|
|
|