i The Safdie Hypermedia Archive - Project Inventory


   Habitat '67


Record Count: 151

Folder No. Title Dates Drawing Type Medium Drawings Project Phase Set Description Set Designation Set Type

2 Context and Base Site Plans, Site and Services Development Plans: Site plans; roof plans; sections; map of Montreal 12 Dec 63 - 20 Oct 64 ExCon Mix 26 PP no
2 Original site plan sketch by Moshe Safdie; pastel on trace 16 Oct 64 Arch TP 1 SD
2 Original site plan sketch by Moshe Safdie; pastel on paper n.d. Arch V 1 SD
4 Sketch Renderings - sun/light studies by Didier n.d. Arch V, TP 9 SD presentation yes
27 Assorted Sketches of Box Combinations and Schedules Oct 64 - Nov 64 Arch V, TP 17 DD no
28 Schematic Drawings n.d., Oct 64 - Nov 64 Arch SP, V 27 DD presentation yes
29 Assorted Sketches of Floor Plans, Kitchen and Bath Studies (1 of 2) 30 Nov 64 - 17 Mar 65 Arch Mix 25 DD no
30 Assorted Sketches of Floor Plans, Kitchen and Bath Studies (2 of 2) 30 Nov 64 - 17 Mar 65 Arch Mix 26 DD no
31 Erection Study 7 Dec 64 Arch SP, V 24 DD no
32 Preliminary Design Drawings (includes folder 33) Progress set: P11-P73 (incomplete) 24 Dec 64 Arch SP, V 17 DD office review yes
33 Kitchen Shop Drawings 24 Dec 64 Arch SP, V 17 DD office review yes
34 Diagrammatic Plans Showing Stacking Organisation 19 Jan 65 - 22 Feb 65 Arch SP, V 22 DD no
35 Sun Angle Study 11 Feb 65 Arch SP, V 20 DD no
36 Overall Site Plan and Site Development Drawings 21 May 65 - 22 Aug 66 Sd M 10 CD no
37 Precasting Drawings and Schedules 12 Mar 65 - 29 Mar 65 S V 30 CD office review yes
38 Structural Working Drawings 18 Mar 65 - 29 Jul 66 S PT 33 CD tender yes
39 Erection Schedule and Structural Drawings of Column Layout and Anchors 7 Aug 65 - 8 Apr 66 S PT 27 CD tender yes
40 Structural Working Drawings: house units, boxes 15 Feb 66 - 13 Mar 67 S M, PT 30 CD no
41 Structural Working Drawings: boxes 31 Jan 67 S PT 18 CD no
42 Escape Stairs with Assembly and Mould Drawings 26 Oct 65 - 22 Jul 66 Shp PT 27 CA no
43 Escape Stairs with Assembly and Mould Drawings, 1st part (1 of 3) 15 Nov 65 - 29 Jun 66 Shp PT 25 CA as-built yes
44 Escape Stairs w/Assembly and Mould Drawings, 1st part (2 of 3) 15 Nov 65 - 29 Jun 66 Shp PT 26 CA as-built yes
45 Escape Stairs w/Assembly and Mould Drawings, 1st part (3 of 3) 15 Nov 65 - 29 Jun 66 Shp PT 25 CA as-built yes
46 Escape Stairs w/Assembly and Mould Drawings, 2nd part (1 of 2) 7 Dec 65 - 7 Jun 66 Shp PT 25 CA no
47 Escape Stairs w/Assembly and Mould Drawings, 2nd part (2 of 2) 7 Dec 65 - 7 Jun 66 Shp PT 25 CA no
48 Escape Stairs with Assembly and Mould Drawings, 3rd part (1 of 2) 28 Feb 66 - 4 Jul 66 Shp PT 22 CA no
49 Escape Stairs with Assembly and Mould Drawings, 3rd part (2 of 2) 28 Feb 66 - 4 Jul 66 Shp PT 25 CA no
50 Escape Stairs (1 of 2) 4 Apr 66 - 14 Sept 66 Shp PT 25 CA no
51 Escape Stairs (2 of 2) 4 Apr 66 - 14 Sept 66 Shp PT 19 CA no
52 Architectural Working Drawings. Phase I with Legend (1 of 8). 9 Mar 65 Arch M, V 29 CD tender yes
53 Architectural Working Drawings. Phase I (2 of 8) 9 Mar 65 Arch M 29 CD tender yes
54 Architectural Working Drawings. Phase I (3 of 8) 9 Mar 65 Arch M 22 CD tender yes
55 Architectural Working Drawings. Phase I (4 of 8) 9 Mar 65 Arch SP, M 28 CD tender yes
56 Architectural Working Drawings. Phase I (5 of 8) 9 Mar 65 Arch SP, M 27 CD tender yes
57 Architectural Working Drawings. Phase I (6 of 8) 9 Mar 65 - 29 Apr 66 Arch SP, M 30 CD tender yes
58 Architectural Working Drawings. Phase I with (7 of 8) 9 Mar 65 - 29 Apr 66 Arch SP, M 25 CD tender yes
59 Architectural Working Drawings. Phase I (8 of 8) 9 Mar 65 - 15 Oct 65 Arch SP, M 9 CD tender yes
60 Preliminary Working Drawings. Phase I (1 of 2). 2 Apr 65 Arch V 27 CD office review yes
61 Preliminary Working Drawings. Phase I (2 of 2). 2 Apr 65 - 7 May 65 Arch SP, V 38 CD office review yes
62 Work In Progress Drawings Showing Municipal Service and Civic Numbers 15 Jul 65 - Aug 66 Arch Mix 20 CD no
63 Shelter Details 14 Feb 66 Arch Mix 17 CD no
64 Restaurant Layout, Expovision Offices, and Construction Exhibit 23 Feb 67 - 14 Apr 67 Arch Mix 2 CD no
65 Coinamatic Laundry Door Schedule and Details 23 Mar 66 - 7 Mar 67 Arch M, V 7 CD no
66 Assorted Developmental Details from Post Preliminary Working Drawing Set 17 Mar 65 - 30 Jun 65 Arch, S V, TP 22 CD no
67 Assorted Sketched Construction Details and Elevations (1 of 2) 2 Jul 65 - 21 Apr 67 Arch, S Mix 29 CD no
68 Assorted Sketched Construction Details and Elevations (2 of 2) 2 Jul 65 - 21 Apr 67 Arch, S Mix 30 CD no
69 Electrical Working Drawings: progress set (1 of 2) 9 Mar 65 - 22 Mar 65 Elec PT 26 CD tender yes
70 Electrical Working Drawings: progress set (2 of 2) Jul 65 - 21 Sept 66 Elec PT 37 CD tender yes
71 Elevator Core Shop Drawings (1 of 2) 22 Feb 66 - 6 Aug 66 Shp PT 26 CA no
72 Elevator Core Shop Drawings (2 of 2) 22 Feb 66 - 6 Aug 66 Shp PT 15 CA no
73 Elevator Shop Drawings (1 of 2) 6 Sept 65 - 2 Sept 66 Shp PT, V 29 CA no
74 Elevator Shop Drawings (2 of 2) 6 Sept 65 - 2 Sept 66 Shp PT, V 27 CA no
75 Elevator Core (1 of 2) 16 Oct 65 - 8 Jun 66 Shp PT 44 CA no
76 Elevator Core (2 of 2) 16 Oct 65 - 8 Jun 66 Shp PT 41 CA no
77 Aluminium Frame and Glazing (1 of 2) 6 Oct 65 - 21 Oct 66 Shp PT 23 CA no
78 Aluminium Frame and Glazing (2 of 2) 6 Oct 65 - 21 Oct 66 Shp PT 20 CA no
79 Housing Box Assembly (1 of 2) 21 Sept 65 - 19 Apr 66 Shp PT 28 CA no
80 Housing Box Assembly (2 of 2) 21 Sept 65 - 19 Apr 66 Shp PT 30 CA no
81 Housing Box Assembly (1 of 2) 19 Oct 65 - 6 Oct 66 Shp PT 25 CA no
82 Housing Box Assembly (2 of 2) 19 Oct 65 - 6 Oct 66 Shp PT 39 CA no
83 House Units Level 2, 1st part (1 of 3) 19 Jan 66 - 22 Feb 66 Shp PT 17 CA no
84 House Units Level 2, 1st part (2 of 3) 19 Jan 66 - 22 Feb 66 Shp PT 29 CA no
85 House Units Level 2, 1st part (3 of 3) 19 Jan 66 - 22 Feb 66 Shp PT 31 CA no
86 House Units Level 2, 2nd part (1 of 2) 13 Feb 66 - 30 Jun 66 Shp PT 24 CA no
87 House Units Level 2, 2nd part (2 of 2) 13 Feb 66 - 30 Jun 66 Shp PT 50 CA no
88 House Units Level 2, 3rd part (1 of 2) 22 Apr 66 - 29 Sept 66 Shp PT 35 CA no
89 House Units Level 2, 3rd part (2 of 2) 22 Apr 66 - 29 Sept 66 Shp PT 23 CA no
90 House Units Level 3, 1st part 23 Feb 66 - 2 Nov 66 Shp PT 27 CA no
91 House Units Level 3, 2nd part (1 of 2) 4 Feb 66 - 4 Apr 66 Shp PT 32 CA no
92 House Units Level 3, 2nd part (2 of 2) 4 Feb 66 - 4 Apr 66 Shp PT 32 CA no
93 House Units Level 3, 3rd part (1 of 2) 27 Apr 66 - 22 Oct 66 Shp PT 13 CA no
94 House Units Level 3, 3rd part (2 of 2) 27 Apr 66 - 22 Oct 66 Shp PT 31 CA no
95 House Units Level 4, 1st part (1 of 6) 6 Jul 66 - 14 Jun 67 Shp PT 25 CA no
96 House Units Level 4, 1st part (2 of 6) 6 Jul 66 - 14 Jun 67 Shp PT 26 CA no
97 House Units Level 4, 1st part (3 of 6) 6 Jul 66 - 14 Jun 67 Shp PT 26 CA no
98 House Units Level 4, 2nd part (4 of 6) 24 May 66 - 28 Oct 66 Shp PT 23 CA no
99 House Units Level 4, 2nd part (5 of 6) 24 May 66 - 28 Oct 66 Shp PT 26 CA no
100 House Units Level 4, 2nd part (6 of 6) 24 May 66 - 28 Oct 66 Shp PT 33 CA no
101 House Units Level 5, 1st part (1 of 2) 11 Mar 66 - 30 Aug 66 Shp PT 25 CA no
102 House Units Level 5, 1st part (2 of 2) 11 Mar 66 - 30 Aug 66 Shp PT 32 CA no
103 House Units Level 5, 2nd part (1 of 2) 24 May 66 - 28 Oct 66 Shp PT 31 CA no
104 House Units Level 5, 2nd part (2 of 2) 24 May 66 - 28 Oct 66 Shp PT 24 CA no
105 House Units Level 6, 1st part (1 of 2) 17 Mar 66 - 22 Oct 66 Shp PT 23 CA no
106 House Units Level 6, 1st part (2 of 2) 17 Mar 66 - 22 Oct 66 Shp PT 27 CA no
107 House Units Level 6, 2nd part (1 of 3) 12 May 66 - 12 Oct 66 Shp PT 27 CA no
108 House Units Level 6, 2nd part (2 of 3) 12 May 66 - 12 Oct 66 Shp PT 29 CA no
109 House Units Level 6, 2nd part (3 of 3) 12 May 66 - 12 Oct 66 Shp PT 29 CA no
110 House Units Level 7, 1st part (1 of 2) 22 Mar 66 - 7 Nov 66 Shp PT 27 CA no
111 House Units Level 7, 1st part (2 of 2) 22 Mar 66 - 7 Nov 66 Shp PT 23 CA no
112 House Units Level 7, 2nd part (1 of 2) 23 Aug 66 - 4 Nov 66 Shp PT 23 CA no
113 House Units Level 7, 2nd part (2 of 2) 23 Aug 66 - 4 Nov 66 Shp PT 21 CA no
114 House Units Level 8, 2nd part (1 of 3) 28 Mar 66 - 21 Sept 66 Shp PT 24 CA no
115 House Units Level 8, 2nd part (2 of 3) 28 Mar 66 - 21 Sept 66 Shp PT 63 CA no
116 House Units Level 8, 2nd part (3 of 3) 10 Jun 66 - 3 Nov 66 Shp PT 28 CA no
117 House Units Level 9 (1 of 2) 30 Mar 66 - 18 Oct 66 Shp PT 25 CA no
118 House Units Level 9 (2 of 2) 30 Mar 66 - 18 Oct 66 Shp PT 18 CA no
119 House Units Level 10 (1 of 2) 19 Apr 66 - 7 Nov 66 Shp PT 19 CA no
120 House Units Level 10 (2 of 2) 19 Apr 66 - 7 Nov 66 Shp PT 32 CA no
121 House Units Level 11 15 Apr 66 - 19 Oct 66 Shp PT 38 CA no
122 House Units Level 12 18 Apr 66 - 25 Oct 66 Shp PT 32 CA no
123 Lower Street Girders, Slabs, and Erection, 1st part (1 of 2) 8 Sept 66 - 8 Dec 66 Shp PT 41 CA no
124 Lower Street Girders, Slabs, and Erection, 1st part (2 of 2) 8 Sept 66 - 8 Dec 66 Shp PT 34 CA no
125 Lower Street Girders, Slabs, and Erection, 2nd part (1 of 2) 9 May 66 - 6 Oct 66 Shp PT 34 CA no
126 Lower Street Girders, Slabs, and Erection, 2nd part (2 of 2) 9 May 66 - 6 Oct 66 Shp PT 34 CA no
127 Lower Street Girders, Slabs, and Erection, 3rd part (1 of 2) 10 Oct 66 - 12 Dec 66 Shp PT 32 CA no
128 Lower Street Girders, Slabs, and Erection, 3rd part (2 of 2) 10 Oct 66 - 12 Dec 66 Shp PT 23 CA no
129 Upper Street Girder, 1st part 22 Apr 66 - 29 Sept 66 Shp PT 24 CA no
130 Upper Street Girders, 2nd part (1 of 2) 30 Sept 66 - 27 Dec 66 Shp PT 33 CA no
131 Upper Street Girders, 2nd part (2 of 2) 30 Sept 66 - 27 Dec 66 Shp PT 34 CA no
132 Erection Plan: lower and upper st. girders 4 May 66 - 6 Feb 67 Shp V, PT 32 CA no
133 Assorted Shop Drawings of Reinforcing Details (1 of 2) 17 Dec 65 - 6 Oct 66 Shp PT 31 CA no
134 Assorted Shop Drawings of Reinforcing Details (2 of 2) 17 Dec 65 - 6 Oct 66 Shp PT 22 CA no
135 Blue Prints 17 Feb 66 - 15 Nov 66 Shp PT 32 CA no
136 Blue Prints 17 Feb 66 - 15 Nov 66 Shp PT 28 CA no
137 Columns and Access Stairs (1 of 3) 10 Mar 66 - 16 Sept 66 Shp PT 28 CA no
138 Columns and Access Stairs (2 of 3) 10 Mar 66 - 16 Sept 66 Shp PT 28 CA no
139 Columns and Access Stairs (3 of 3) 10 Mar 66 - 16 Sept 66 Shp PT 30 CA no
140 Bathroom shop drawings set 23 Mar 66 - 18 Oct 66 Shp PT 33 CA no
140 Shop drawings: SK revisions (11x14) 23 Mar 66 - 18 Oct 66 Shp PT 3 CA
140 Original correspondence with REFF products December 1965. 3 pages 23 Mar 66 - 18 Oct 66 Shp PT 0 CA
140 Shop drawings for hollow metal doors July 1966 23 Mar 66 - 18 Oct 66 Shp PT 21 CA
140 Shop drawings kitchen hoods 23 Mar 66 - 18 Oct 66 Shp PT 1 CA
140 Shop drawing approved door types August 1966 23 Mar 66 - 18 Oct 66 Shp PT 1 CA
141 Planter Units, Railings and Balustrade (1 of 2) 1 Apr 66 - 7 Sept 66 Shp PT 25 CA no
142 Planter Units, Railings and Balustrade (2 of 2) 1 Apr 66 - 7 Sept 66 Shp PT 27 CA no
143 Aluminium Glass and Framing 4 May 66 - 6 Feb 67 Shp V, PT 22 CA no
144 Aluminium Frame and Glazing for Street Shelters 19 Aug 66 Shp PT 29 CA yes
145 Various Drawings, Post Habitat Opening 7 Jun 67 - 5 Aug 86 Arch Mix 48 AD
146 Completion of North Cluster (1 of 2) 10 Apr 70 Arch M, V 36 CD tender yes
147 Completion of North Cluster (2 of 2) 10 Apr 70 Arch M, V 21 CD tender yes
148 Completion of North Cluster (1 of 2) 10 Apr 70 Arch PT 19 CD no
149 Completion of North Cluster (2 of 2) 10 Apr 70 Mech, P PT 20 CD no
150 Habitat '67 Maintenance: Reduced Set of Floor Plans n.d. Arch PHPT 27 AD office review yes
151 Habitat '67 Maintenance: Maintenance Evaluation and Field Survey Jan 74 Arch PT 28 AD office review yes
152 Habitat '67 Maintenance: Drafted Plans from Field Notes Jan 74 Arch SP 28 AD office review yes
153 Habitat '67 Maintenance: New Street Membrane and Location of Joints May 74 Arch SP 22 AD office review yes
154 Habitat '67 Maintenance: Revisions for Construction Modification 4 Sept 74 - 16 Jan 76 Elec, Mech PT 40 AD no
155 Health Community Centre and Lobby Renovations '86 Arch Mix 42 DD office reference yes
156 Cartoons, Drawings and Cluster Photo - - - 39 - office reference yes
157 Architectural Working Drawings - Full Set (Phase 1) 9 Mar 65 Arch PT 176 CD tender yes tender
158 Axonometrics, floor plans, apartment section (for presentation?); 8.5x11, 11x14, 17x22" n.d. Arch M 8 SD
159 Habitat 67 presentation boards: plans, site plans, renderings laminated on board n.d. Arch Mix 21 PP
160 "Preliminary Proposal: Man and the Community Theme Exhibit": plans and model photos mounted on small boards n.d. Arch Mix 12 PP
161 "Preliminary Proposal: Gallery for Fine Arts Exhibit to form an integral part of the project Habitat 67" by Safdie, Parkin Assoc. Architects 11-Jun-64 Arch Mix 17 PP
162 Proposal for a commercial center: plans, sections, model photos mounted on board n.d. Arch Mix 9 PP
163 "Habitat construction exhibit" - drawings and photos of construction mounted on board n.d. Arch Mix 15
164 Phase I and II model photos and plans mounted on board n.d. Arch Mix 21
165 Black and white photos of different models of Habitat mounted on board. Includes one photo of close up of a model. n.d. 0
166 Black and white construction photos of Habitat mounted on board n.d. Mix 0
167 Plans and photos mounted on board n.d. Arch Mix 124 SD
168 Photos of furnished Habitat interiors mounted on board; black and white; marked on back as "Massey Medal Submission" n.d. 0