i The Safdie Hypermedia Archive - Project Inventory


   Habitat Original Proposal 1964


Record Count: 35

Folder No. Title Dates Drawing Type Medium Drawings Project Phase Set Description Set Designation Set Type

3 Preliminary Precasting Plant and Erection Layout (SK-1; SK2 ) 16 Apr 64 S SP, V 4 SD no
5 Entrance and Preliminary Circulation Studies n.d. Arch SP, TP 19 SD no
6 Preliminary Design Presentation and Tracings (1 of 2) 1962 - 1967 Arch Mix 35 SD presentation yes
7 Preliminary Design Presentation and Tracings [9 sections for Scheme A and B] (2 of 2) 1962 - 1967 Arch Mix 8 SD presentation yes
8 Site Development Plans 16 Oct 63 - 18 Jun 64 Arch, Sd Mix 15 SD no
9 Schematic Design Drawings [drawing numbers D1-21 with gaps in run] (1 of 3) 20 Jul 64 Arch M 26 SD presentation yes
10 Schematic Design Drawings [drawings D1-D43 with gaps in run] (2 of 3) 20 Jul 64 Arch V 17 SD presentation yes
14 Schematic Design Drawings (3 of 3) (D51-D91) 20 Jul 64 Arch M 20 SD presentation yes
15 Progress Drawings and Foundation Plans; D13-D15; S1-S9; S80 20 Jul 64 S SP 13 DD no
16 Edge Member Studies and Associated Sketches (1 of 3) 24 Apr 64 - 30 Oct 64 Arch Mix 33 DD no
17 Edge Member Studies and Associated Sketches by unknown (2 of 3) 24 Apr 64 - 30 Oct 64 Arch Mix 33 DD no
18 Edge Member Studies and Associated Sketches (3 of 3) 24 Apr 64 - 30 Oct 64 Arch Mix 36 DD no
19 Preliminary Design Development Drawings 27 Jul 64 - 16 Nov 64 Arch TP, V 30 DD no
19 Preliminary Design Development Drawings: Sketches by EC: Floor and walls one piece roof applied separately roof insulation outside and inside 27 Jul 64 - 16 Nov 64 Arch TP, V 3 DD
19 Preliminary Design A1:N44 Drawings: Sketches by EC: Floor and walls one piece roof applied separately roof insulation outside and inside 27 Jul 64 - 16 Nov 64 Arch TP, V 3 DD no
19 Preliminary Design Development Drawings: System of erection of boxes before terraces & Diagrammatic breakdown of typical cluster/process of erection; ink and pencil on trace 27 Jul 64 - 16 Nov 64 Arch TP,V 2 DD no
19 Preliminary Design Development Drawings: System of erection of boxes before terraces & Diagrammatic breakdown of typical cluster showing process of erection 27 Jul 64 - 16 Nov 64 Arch TP, V 2 DD
19 Preliminary Design Development Drawings: Total beaming area 27 Jul 64 - 16 Nov 64 Arch TP, V 2 DD
19 Preliminary Design Development Drawings: Standard kitchen plans 27 Jul 64 - 16 Nov 64 Arch TP, V 7 DD
19 Preliminary Design Development Drawings: Studies and plans of box combination 27 Jul 64 - 16 Nov 64 Arch TP, V 9 DD
19 Preliminary Design Development Drawings: SK sections and plans 27 Jul 64 - 16 Nov 64 Arch TP, V 4 DD
19 Preliminary Design Development Drawings: SK sections and plans 27 Jul 64 - 16 Nov 64 Arch TP, V 4 DD
19 Preliminary Design Development Drawings: Storey area alternatives 27 Jul 64 - 16 Nov 64 Arch TP, V 2 DD
20 Preliminary Drawings 27 Jul 64 - 16 Nov 64 Arch V, TP 11 DD no
21 Assorted Schematic Design Development Sketches n.d. Arch Mix 182 DD no
22 Schematic Sketches of Commercial Centre Hotel (1 of 2) 22 Sept 64 - 7 Oct 64 Arch Mix 23 DD no
22 Rendering of hotel interior; artist unknown; charcoal on trace 22 Sept 64 - 7 Oct 64 Arch TP 1 DD no
22 Reproduction on transparency of original Moshe Safdie exterior elevation sketch for Commercial Centre Hotel 22 Sept 64 - 7 Oct 64 Arch Mix 1 DD no
22 Rendering of hotel interior; unknown artist 1964 Arch 1 DD
23 Schematic Sketches of Commercial Centre Hotel (2 of 2); HSK1-16 28 Sept 64 - 16 Oct 64 Arch V 25 DD yes
24 Original Proposal: Preliminary Drawings: house types: schedules; floor plans; 22 storey plans (1 of 2) 6 Oct 64 - 15 Oct 64 Arch V 18 DD no
25 Original Proposal: Preliminary Drawings and floor plans(2 of 2) 6 Oct 64 - 15 Oct 64 Arch V 18 DD no
26 Original Proposal: Associated Drawings of Housing for the Aged (complete set) 26 Oct 64 Arch SP, V 18 DD presentation yes
27 Plans and model photos mounted on board n.d. Arch Mix 10 PP
159 Site section of original proposal (for presentation?); 17x22" n.d. Arch M 1 DD