i The Safdie Hypermedia Archive - Project Inventory


   Habitat Original Proposal 1964


Record Count: 35

Folder No. Title Dates Drawing Type Medium Drawings Project Phase Set Description Set Designation Set Type

3 Preliminary Precasting Plant and Erection Layout (SK-1; SK2 ) 16 Apr 64 S SP, V 4 SD no
5 Entrance and Preliminary Circulation Studies n.d. Arch SP, TP 19 SD no
6 Preliminary Design Presentation and Tracings (1 of 2) 1962 - 1967 Arch Mix 35 SD presentation yes
7 Preliminary Design Presentation and Tracings [9 sections for Scheme A and B] (2 of 2) 1962 - 1967 Arch Mix 8 SD presentation yes
8 Site Development Plans 16 Oct 63 - 18 Jun 64 Arch, Sd Mix 15 SD no
9 Schematic Design Drawings [drawing numbers D1-21 with gaps in run] (1 of 3) 20 Jul 64 Arch M 26 SD presentation yes
10 Schematic Design Drawings [drawings D1-D43 with gaps in run] (2 of 3) 20 Jul 64 Arch V 17 SD presentation yes
14 Schematic Design Drawings (3 of 3) (D51-D91) 20 Jul 64 Arch M 20 SD presentation yes
15 Progress Drawings and Foundation Plans; D13-D15; S1-S9; S80 20 Jul 64 S SP 13 DD no
16 Edge Member Studies and Associated Sketches (1 of 3) 24 Apr 64 - 30 Oct 64 Arch Mix 33 DD no
17 Edge Member Studies and Associated Sketches by unknown (2 of 3) 24 Apr 64 - 30 Oct 64 Arch Mix 33 DD no
18 Edge Member Studies and Associated Sketches (3 of 3) 24 Apr 64 - 30 Oct 64 Arch Mix 36 DD no
19 Preliminary Design Development Drawings: Sketches by EC: Floor and walls one piece roof applied separately roof insulation outside and inside 27 Jul 64 - 16 Nov 64 Arch TP, V 3 DD
19 Preliminary Design Development Drawings: System of erection of boxes before terraces & Diagrammatic breakdown of typical cluster showing process of erection 27 Jul 64 - 16 Nov 64 Arch TP, V 2 DD
19 Preliminary Design Development Drawings: Total beaming area 27 Jul 64 - 16 Nov 64 Arch TP, V 2 DD
19 Preliminary Design Development Drawings: Standard kitchen plans 27 Jul 64 - 16 Nov 64 Arch TP, V 7 DD
19 Preliminary Design Development Drawings: Studies and plans of box combination 27 Jul 64 - 16 Nov 64 Arch TP, V 9 DD
19 Preliminary Design Development Drawings: SK sections and plans 27 Jul 64 - 16 Nov 64 Arch TP, V 4 DD
19 Preliminary Design Development Drawings: SK sections and plans 27 Jul 64 - 16 Nov 64 Arch TP, V 4 DD
19 Preliminary Design Development Drawings: Storey area alternatives 27 Jul 64 - 16 Nov 64 Arch TP, V 2 DD
19 Preliminary Design Development Drawings 27 Jul 64 - 16 Nov 64 Arch TP, V 30 DD no
19 Preliminary Design A1:N44 Drawings: Sketches by EC: Floor and walls one piece roof applied separately roof insulation outside and inside 27 Jul 64 - 16 Nov 64 Arch TP, V 3 DD no
19 Preliminary Design Development Drawings: System of erection of boxes before terraces & Diagrammatic breakdown of typical cluster/process of erection; ink and pencil on trace 27 Jul 64 - 16 Nov 64 Arch TP,V 2 DD no
20 Preliminary Drawings 27 Jul 64 - 16 Nov 64 Arch V, TP 11 DD no
21 Assorted Schematic Design Development Sketches n.d. Arch Mix 182 DD no
22 Rendering of hotel interior; unknown artist 1964 Arch 1 DD
22 Schematic Sketches of Commercial Centre Hotel (1 of 2) 22 Sept 64 - 7 Oct 64 Arch Mix 23 DD no
22 Rendering of hotel interior; artist unknown; charcoal on trace 22 Sept 64 - 7 Oct 64 Arch TP 1 DD no
22 Reproduction on transparency of original Moshe Safdie exterior elevation sketch for Commercial Centre Hotel 22 Sept 64 - 7 Oct 64 Arch Mix 1 DD no
23 Schematic Sketches of Commercial Centre Hotel (2 of 2); HSK1-16 28 Sept 64 - 16 Oct 64 Arch V 25 DD yes
24 Original Proposal: Preliminary Drawings: house types: schedules; floor plans; 22 storey plans (1 of 2) 6 Oct 64 - 15 Oct 64 Arch V 18 DD no
25 Original Proposal: Preliminary Drawings and floor plans(2 of 2) 6 Oct 64 - 15 Oct 64 Arch V 18 DD no
26 Original Proposal: Associated Drawings of Housing for the Aged (complete set) 26 Oct 64 Arch SP, V 18 DD presentation yes
27 Plans and model photos mounted on board n.d. Arch Mix 10 PP