Box No. |
Box Name |
Folders |
Dates |
Dimensions |
Summary |
|
2016.03 |
World Union for Progressive Judaism: Drawings & project documentation |
10 |
|
0 |
|
2016.04 |
World Union for Progressive Judaism: Drawings & project documentation |
8 |
1984, 1996-2003 |
0 |
|
J18 |
Drawings and Sketches |
4 |
December 1980 - September 1988 |
0.06 |
correspondence; drawings/sketches [assorted manuals containing detail drawings] |
J36 |
Correpondence |
8 |
December 1979 - January 1989 |
0.18 |
brochure; correspondence; drawings/sketches [brochure for construction company] |
J37 |
Correspondence and Drawings |
9 |
August 1972 - February 1989 |
0.18 |
correspondence; applications/information on submissions; legal approval/permits; reference material from other projects; project design criteria/program; drawings/sketches; product data/samples; punch lists/deficiency lists [consultant contract propositions] |
J38 |
Drawings |
3 |
January 1985 - December 1989 |
0.22 |
correspondence; drawings/sketches; finish/window/door schedules; product data/samples [electrical drawings for execution; signage drawings; library and reception drawings] |
J39 |
Correspondence and Drawings |
5 |
December 1985 - June 1989 |
0.145 |
correspondence; drawings/sketches; finish/window/door schedules; cost estimates [list of furniture accessories cost and quantities] |
J40 |
Correspondence and Reports |
9 |
November 1980 - April 1987 |
0.14 |
correspondence; project design criteria/program; reports; drawings/sketches; specifications [program cost analysis study; landscape maintenance manual; hardware specification; HVAC tender contract; spiral staircase load calculation; specification of electrical low tension systems] |
J41 |
Drawings and Specifications |
4 |
July 1984 - July 1988 |
0.2 |
correspondence; drawings/sketches; specifications; cost estimates [interior design drawings part of detail manual; electrical specification; updated budget report] |
J42 |
Drawings |
5 |
March 1984 - May 1988 |
0.205 |
brochures; project design criteria/program; correspondence; drawings/sketches; reports; product data/samples [school program study; organization and area diagrams on trace; electrical power supply drawings for execution] |
J60 |
Drawings |
3 |
October 1985 - October 1986 |
0.14 |
correspondence; drawings/sketches; product data/samples |
J62 |
Drawings |
4 |
February 1984 - October 1988 |
0.205 |
correspondence; drawings/sketches; product data/samples [planting plans] |
J63 |
Drawings |
4 |
October 1984 - March 1988 |
0.11 |
correspondence; drawings/sketches; product data/samples |
J64 |
Drawings and Correspondence |
3 |
May 1984 - August 1985 |
0.15 |
correspondence; drawings/sketches; finish/window/door schedules; product data/samples [kitchen consultant drawings] |
J66 |
Drawings and Specifications |
3 |
March 1984 - November 1988 |
0.175 |
correspondence; drawings/sketches; specifications; product data/samples; cost estimates; shop drawings |
J67 |
Drawings and Correspondence |
3 |
November 1983 - June 1986 |
0.22 |
correspondence; drawings/sketches; finish/window/door schedules; product data/samples [furtniture details] |
J68 |
Drawings and Cost Estimates |
3 |
November 1983 - October 1989 |
0.1 |
reports; drawings/sketches; cost estimates [HUC Annual Report, 1989] |
J69 |
Drawings and Project Design Program |
4 |
October 1973 - June 1985 |
0.21 |
brochures; project design criteria/program; correspondence; drawings/sketches; finish/window/door schedules |
J89 |
Drawings |
1 |
May 1987 |
0.005 |
drawings/sketches |
OF1000.1 |
Correspondence, Drawings, and Cost Estimates |
15 |
December 1973 - September 1986 |
0.27 |
correspondence; time/construction schedules; reference material from other projects; zoning/building code information; project design criteria/program; cost estimates; reports; specifications; shop drawings; field orders; as-built drawings [phase II budget updates; articles on copyright; report on concrete testing; program analysis] |
OF1000.6 |
Reports |
1 |
April 1973 - January 1976 |
0.015 |
reports |
PF301.3 |
Correspondence |
1 |
November 1984 - October 1988 |
0.005 |
correspondence |
PJT301/01 |
Reports and Cost Estimates |
22 |
August 1982 - May 1988 |
0.23 |
reference material from other projects; project design criteria/program; correspondence; drawings/sketches; reports; cost estimates; shop drawings [update reports; "Landscape Maintenance Manual;" "Tower of David, The Museum of the History of Jerusalem Annual Report"] |