i The Safdie Hypermedia Archive - Project Inventory


   Esplanade Condominiums


Record Count: 229

Folder No. Title Dates Drawing Type Medium Drawings Project Phase Set Description Set Designation Set Type

1 Cambridge Buildings, Landscaping Plan, and Plant Details of Front Park 4 Mar 86 - 10 Nov 86 Ref PT 12 PP
2 Site Survey Plans n.d., Dec 57 - 26 Mar 86 ExCon PT, SP 21 PP
4 As-Built Surface Utilities Control Diagram and Plan of Site 26 Mar 86 - 25 Nov 87 ExCon PT, SP 17 PP
6 Schematic Section and Sketch Plan Showing Levels n.d., 6 Aug 84 Arch TP, V 2 SD
7 Schematic Record Set-Associated Architectural Drawings (1 of 4) n.d., 17 Apr 85 - 3 Apr 86 Arch Mix 31 SD
8 Schematic Record Set-Associated Architectural Drawings (2 of 4) n.d., 17 Apr 85 - 3 Apr 86 Arch Mix 31 SD
11 Schematic Record Set (3 of 4) n.d., 6 Dec 85 - 18 Apr 86 Arch Mix 31 SD office review
12 Schematic Record Set (4 of 4) n.d., 6 Dec 85 - 18 Apr 86 Arch Mix 31 SD office review
13 Presentation Set n.d., 6 Dec 85 Arch Mix 8 SD presentation
14 Plans, Sections, and Shadow Studies (1 of 2) n.d., 6 Dec 85 - 6 Jun 86 Arch Mix 30 SD office review
15 Plans, Sections, and Shadow Studies (2 of 2) n.d., 6 Dec 85 - 6 Jun 86 Arch Mix 31 SD office review
20 Assorted Flloor Plans, FAR Calculations, Fire Egress, and Separation (1 of 3) n.d., 3 Feb 86 - 11Apr 87 Arch Mix 25 SD
21 Assorted Flloor Plans, FAR Calculations, Fire Egress, and Separation (2 of 3) n.d., 3 Feb 86 - 11Apr 87 Arch Mix 25 SD
22 Assorted Flloor Plans, FAR Calculations, Fire Egress and, Separation (3 of 3) n.d., 3 Feb 86 - 11Apr 87 Arch Mix 25 SD
23 FAR Calculations, Building Areas, and Unit Distribution 4 Feb 86 - 4 Mar 86 Arch PHC, PT 14 SD
25 Elevation Studies of Terraces and Greenhouses n.d., 31 Mar 86 Arch PT 22 SD
26 Elevation, WIndow, Terrace, and Detail Studies (1 of 2) n.d., 7 Apr 86 - 12 Aug 86 Arch Mix 46 SD
27 Elevation, WIndow, Terrace, and Detail Studies (2 of 2) n.d., 7 Apr 86 - 12 Aug 86 Arch Mix 47 SD
28 Record Set-Schematic Design (1 of 2) 18 Apr 86 Arch SP 22 SD office review
29 Record Set-Schematic Design (2 of 2) 18 Apr 86 Arch PT 23 SD office review
34 Site Improvement Study-Curb Cuts, Grading, Drainage and, Landscaping n.d., 12 Jun 86 - 30 Oct 86 Sd Mix 28 DD
35 Site Plan Concept Sketch, Paving Study, Field Study, Curb Cuts, and Easements 30 Jun 86 - 12 May 88 Sd, Arch Mix 19 DD
36 Roadway Improvement Project Drawings n.d., 30 Jul 86 Sd PT, SP 29 DD
45 Building Permit Set Record Sepias- Floor Plans 9 Jul 86 - 4 Sept 86 S SP 16 DD application for permit
47 Building Permit Set 22 Jul 86 S PT 15 DD application for permit
48 Record Set-Design Development 22 Jul 86 S SP 15 DD office review
53 Assorted Plans and Elevations of Kitchens n.d. Arch PT, V 21 DD
54 Unit Plan Coordination Drawings n.d. Arch V, SP 49 DD
55 Assorted Developmental Plans and Terrace Axonometric Study n.d., 16 Apr 86 - 14 Oct 88 Arch Mix 13 DD
56 Study Drawings- Elevations, Perspectives, Axonometrics, and Sections (1 of 4) n.d., 27 May 86 - 19 May 87 Arch Mix 25 DD
57 Study Drawings- Elevations, Perspectives, Axonometrics, and Sections (2 of 4) n.d., 27 May 86 - 19 May 87 Arch Mix 25 DD
58 Study Drawings- Elevations, Perspectives, Axonometrics, and Sections (3 of 4) n.d., 27 May 86 - 19 May 87 Arch Mix 25 DD
59 Study Drawings- Elevations, Perspectives, Axonometrics, and Sections (4 of 4) n.d., 27 May 86 - 19 May 87 Arch Mix 28 DD
68 Building Permit Set (1 of 2) 6 Jun 86 - 22 Jul 86 Arch PT 31 DD application for permit
69 Record Set-Design Development (2 of 2) 6 Jun 86 - 22 Jul 86 Arch SP 30 DD office review
73 Plans and Sections Showing Stair and Ramp Calculations 24 Jun 86 - Aug 87 Arch PT, V 20 DD
74 Architectural and Structural Drawings (1 of 4) n.d., 30 Jun 86 - 1 Sept 87 Arch, S PT 25 DD office review
75 Architectural and Structural Drawings (2 of 4) n.d., 30 Jun 86 - 1 Sept 87 Arch, S PT 25 DD office review
76 Architectural and Structural Drawings (3 of 4) n.d., 30 Jun 86 - 1 Sept 87 Arch, S PT 25 DD office review
77 Architectural and Structural Drawings (4 of 4) n.d., 30 Jun 86 - 1 Sept 87 Arch, S PT 27 DD office review
78 Building Permit Set-Record Sepias (1 of 2) 19 Jul 86 - 3 Sept 86 Arch SP 21 DD application for permit
79 Building Permit Set-Record Sepias (2 of 2) 19 Jul 86 - 3 Sept 86 Arch SP 22 DD application for permit
80 Record Set-Elevations and Sections 22 Jul 86 Arch PT 9 DD office review
86 Building Permit Set -Plans, Elevations, Sections, and Details n.d., 11 Aug 86 - 3 Sept 86 Arch SP 39 DD office review
91 Terrace and Brick Coursing Studies, and Assorted Drawings n.d., 3 Sept 86 - 28 Aug 87 Arch Mix 33 DD
92 Assorted Details, Axonometric, Entrance Canopy, and Wall Sections (1 of 2) 4 Sept 86 - 6 Jul 87 Arch SP 20 DD
93 Assorted Details, Axonometric, Entrance Canopy, and Wall Sections (2 of 2) 4 Sept 86 - 6 Jul 87 Arch SP 20 DD
95 Check Set (1 of 2) 11 Sept 86 Arch PT 22 DD office review
96 Check Set (2 of 2) 11 Sept 86 Arch PT 22 DD office review
98 Pricing Set-Plans, Elevations, Sections, Landscaping, and Details 16 Dec 86 - 23 Dec 86 Arch PT 19 DD office review
99 Assorted Drawings n.d., 23 Dec 86 - 15 Dec 87 Arch Mix 17 DD
100 Plans and Sections (1 of 2) n.d., 5 Jan 87 - 27 Mar 87 Arch Mix 34 DD
101 Plans and Sections (2 of 2) n.d., 5 Jan 87 - 27 Mar 87 Arch Mix 35 DD
102 Assorted Garage Plans (1 of 2) 22 Jan 87 - 2 Apr 87 Arch Mix 25 DD
103 Assorted Garage Plans (2 of 2) 22 Jan 87 - 2 Apr 87 Arch Mix 25 DD
107 Bay Window, Brick Support, Terrace, Precast and Detail Studies n.d., 26 Feb 88 - 26 Oct 88 Arch Mix 39 DD
109 Assorted Drawings for Entrance Canopy and Entry Light Fixture n.d., 1 Sept 88 - 23 May 89 Arch Mix 20 DD
132 Site Plan Showing Landscaping and Related Details n.d., 9 Jan 87 - 15 Dec 87 Sd Mix 21 CD
133 Record Set-Plans, Elevations and Sections at Ramps 12 Dec 86 - 9 Jan 87 S SP 30 CD office review
134 In-Progress Assorted Structural Drawings 12 Dec 86 - 9 Jan 87 S SP 15 CD
135 Pricing Set-Geotechnical Drawings and Assorted Plans & Elevations 15 Jan 87 S PT 18 CD office review
136 Record Set 15 Jan 87 S SP 16 CD office review
137 Record Sepias-Estimate Set 15 Jan 87 S SP 18 CD office review
138 Pricing Set Record Sepias -Geotechnical Drawings 15 Jan 87 S SP 17 CD office review
139 Assorted Drawings n.d., 1 May 87 - 27 May 87 S SP, PT 23 CD
140 Progress Drawings n.d., 7 May 87 - 14 May 87 S PT 11 CD
141 Progress Set n.d., 7 May 87 - 12 Jun 87 S PT 12 CD office review
142 Progress Prints 7 May 87 - 12 Jun 87 S PT 12 CD office review
143 Assorted Geotechnical Drawings including Foundation Plans and Details n.d., 8 May 87 - 23 Nov 87 S Mix 28 CD
144 Foundation, Sub-Basement, and Basement Plans 8 Jul 87 - 16 Feb 88 S SP, PT 14 CD office review
145 Complete Structural Record Drawings, Unbuilt Design of L.E.R. 8 Jul 87 - 15 Jan 88 S M 16 CD office review
146 Assorted Working Drawings and Structural Record Drawings 10 Jul 87 - 18 Dec 87 S Mix 32 CD
147 Record Set-75 Cambridge Parkway 25 Aug 87 S PT 18 CD office review
148 Outdated Structural Drawings and Blackline Print Set 1 Sept 87 - 2 Oct 87 S Mix 15 CD office review
153 Progress Set-Assorted Plans, Elevations, and Sections 2 Nov 87 - 2 Dec 87 S SP, M 21 CD office review
156 Foundation, Basement and Assorted Plans, Elevations, and Sections (1 of 2) 11 Nov 87 - 18 Mar 87 S PT 28 CD
159 Plans, Elevations, Sections and, Mechanical Floor Openings 15 Dec 87 S SP 26 CD office review
160 Superceded Electrics (2 of 2) 11 Apr 88 - 19 Apr 88 S PT 12 CD office review
161 Complete Record Structural Drawings, In-Progress n.d., 19 Apr 88 - 10 May 88 S SP 33 CD
164 Complete Record Structural Drawings, Unstamped Progress Drawings (1 of 3) 26 Apr 88 - May 88 S SP 20 CD
165 Complete Record Structural Drawings, Unstamped Progress Drawings (2 of 3) 26 Apr 88 - May 88 S SP 21 CD
166 Complete Record Structural Drawings, Unstamped Progress Drawings (3 of 3) 26 Apr 88 - 29 Jun 88 S SP, PT 34 CD
167 Complete Record Structural Drawings, In-Progress (1 of 2) n.d., 26 Apr 88 - 17 May 88 S SP 26 CD
168 Complete Record Structural Drawings, In-Progress (2 of 2) n.d., 26 Apr 88 - 17 May 88 S SP 26 CD
170 Post-Design Presentation Drawings n.d. Arch Mix 33 CD
171 Progress Set (1 of 3) n.d., June 86 - 24 Jun 87 Arch PT 25 CD office review
172 Progress Set (2 of 3) n.d., June 86 - 24 Jun 87 Arch PT 25 CD office review
173 Progress Set (3 of 3) n.d., June 86 - 24 Jun 87 Arch PT 26 CD office review
174 Pricing Set (1 of 2) n.d., 6 Jun 86 - 15 Jan 87 Arch, Sd SP 30 CD office review
175 Pricing Set (2 of 2) n.d., 6 Jun 86 - 15 Jan 87 Arch, Sd SP 31 CD office review
177 Progress Set (1 of 5) n.d., 5 Jan 87 - 17 Jul 87 Arch, Mech, S PT 25 CD office review
178 Progress Set (2 of 5) n.d., 5 Jan 87 - 17 Jul 87 Arch, Mech, S PT 25 CD office review
179 Progress Set (3 of 5) n.d., 5 Jan 87 - 17 Jul 87 Arch, Mech, S PT 25 CD office review
180 Progress Set (4 of 5) n.d., 5 Jan 87 - 17 Jul 87 Arch, Mech, S PT 25 CD office review
181 Progress Set (5 of 5) n.d., 5 Jan 87 - 17 Jul 87 Arch, Mech, S PT 26 CD office review
183 Record Set (1 of 2) 15 Jan 87 Arch SP, PT 32 CD office review
184 Record Set (2 of 2) 15 Jan 87 Arch SP, PT 32 CD office review
185 Pricing Set Record Sepias - Assorted Architectural (1 of 2) 15 Jan 87 Arch SP 31 CD office review
186 Pricing Set Record Sepias - Assorted Architectural (2 of 2) 15 Jan 87 Arch SP 31 CD office review
187 Terrace Drain Coordination Plans and Assorted Plans and Ramp Study 2 Feb 87 - 18 Mar 87 Arch Mix 23 CD
189 Revised Assorted Garage Plans n.d., 19 Feb 87 - 21 May 87 Arch V, SP 32 CD
195 Unit Floor Plans (1 of 4) n.d., 12 Apr 87 - 25 Jun 87 Arch Mix 27 CD
196 Unit Floor Plans (2 of 4) n.d., 12 Apr 87 - 25 Jun 87 Arch Mix 27 CD
197 Unit Floor Plans (3 of 4) n.d., 12 Apr 87 - 25 Jun 87 Arch Mix 27 CD
198 Unit Floor Plans (4 of 4) n.d., 12 Apr 87 - 25 Jun 87 Arch Mix 29 CD
199 Architectural In-Progress Bound Set 13 Apr 87 - 27 Apr 87 Arch PT 14 CD office review
200 Record Set, Signed-Off Unit Plans 14 Apr 87 - 2 May 87 Arch PT 29 CD office review
218 75 Cambridge Parkway Record Set (1 of 3) 25 Aug 87 Arch PT 28 CD office review
219 75 Cambridge Parkway Record Set (2 of 3) 25 Aug 87 Arch PT 28 CD office review
220 75 Cambridge Parkway Record Set (3 of 3) 25 Aug 87 Arch PT 29 CD office review
236 Progress Set-Assorted Elevations, Sections, Schedules and Details 2 Nov 87 Arch SP 28 CD office review
237 Architectural Office Record Check Set (1 of 5) 30 Nov 87 Arch PT 25 CD office review
238 Architectural Office Record Check Set (2 of 5) 30 Nov 87 Arch PT 25 CD office review
239 Architectural Office Record Check Set (3 of 5) 30 Nov 87 Arch PT 25 CD office review
240 Architectural Office Record Check Set (4 of 5) 30 Nov 87 Arch PT 25 CD office review
241 Architectural Office Record Check Set (5 of 5) 30 Nov 87 Arch PT 16 CD office review
242 Tender Set (1 of 5) 15 Dec 87 Arch SP 25 CD tender
243 Tender Set (2 of 5) 15 Dec 87 Arch SP 25 CD tender
244 Tender Set (3 of 5) 15 Dec 87 Arch SP 25 CD tender
245 Tender Set (4 of 5) 15 Dec 87 Arch SP 25 CD tender
246 Tender Set (5 of 5) 15 Dec 87 Arch SP 22 CD tender
247 Complete Progress Set (1 of 5) n.d., 15 Dec 87 - 19 Jul 88 Arch, Sd PT 17 CD office review
248 Complete Progress Set (2 of 5) n.d., 15 Dec 87 - 19 Jul 88 Arch, Sd PT 17 CD office review
249 Complete Progress Set (3 of 5) n.d., 15 Dec 87 - 1 Aug 88 Arch PT 20 CD office review
250 Complete Progress Set (4 of 5) n.d., 15 Dec 87 - 1 Aug 88 Arch PT 21 CD office review
251 Complete Progress Set (5 of 5) 15 Dec 87 - 1 Aug 88 Arch PT 32 CD office review
252 Architectural Record Drawings-CD Complete (1 of 10) 15 Dec 87 - 4 Nov 88 Arch SP 25 CD office review
253 Architectural Record Drawings-CD Complete (2 of 10) 15 Dec 87 - 4 Nov 88 Arch SP 26 CD office review
254 Architectural Record Drawings-CD Complete (3 of 10) n.d., 15 Dec 87 - 16 Jan 89 Arch SP 19 CD office review
255 Architectural Record Drawings-CD Complete (4 of 10) n.d., 15 Dec 87 - 16 Jan 89 Arch SP 19 CD office review
256 Architectural Record Drawings-CD Complete (5 of 10) 15 Dec 87 - 16 Jan 89 Arch SP 20 CD office review
257 Architectural Record Drawings-CD Complete (6 of 10) 15 Dec 87 - 16 Jan 89 Arch SP 20 CD office review
258 Architectural Record Drawings- CD Complete (7 of 10) n.d., 15 Dec 87 - 16 Jan 89 Arch Mix 17 CD office review
259 Architectural Record Drawings- CD Complete (8 of 10) n.d., 15 Dec 87 - 16 Jan 89 Arch Mix 18 CD office review
260 Architectural Record Drawings- CD Complete (9 of 10) 15 Dec 87 - 15 Aug 88 Arch SP 16 CD office review
261 Architectural Record Drawings- CD Complete (10 of 10) 15 Dec 87 - 15 Aug 88 Arch SP 16 CD office review
262 Architectural Working Drawings, originals (1of 6) 15 Dec 87 - 9 May 88 Arch M 14 CD
263 Architectural Working Drawings, originals (2 of 6) 15 Dec 87 - 16 Jan 89 Arch M 14 CD
264 Architectural Working Drawings, originals (3 of 6) 15 Dec 87 Arch M 14 CD
265 Architectural Working Drawings, originals (4 of 6) 15 Dec 87 Arch M 12 CD
266 Architectural Working Drawings, originals (5 of 6) 15 Dec 87 - 16 Jan 89 Arch M 13 CD
267 Architectural Working Drawings, originals (6 of 6) n.d., 15 Dec 87 Arch M 10 CD
270 Progress - Plans, Elevations, Sections, Kitchens and Details (1 of 3) n.d., 15 Dec 87 - 14 Dec 88 Arch SP 33 CD
271 Progress - Plans, Elevations, Sections, Kitchens and Details (2 of 3) n.d., 15 Dec 87 - 14 Dec 88 Arch SP 33 CD
272 Progress - Plans, Elevations, Sections, Kitchens and Details (3 of 3) n.d., 15 Dec 87 - 14 Dec 88 Arch SP 33 CD
273 Plans, Reflected Ceiling Plans, Elevations, Sections, and Details (1 of 4) 15 Dec 87 Arch SP 25 CD office review
274 Plans, Reflected Ceiling Plans, Elevations, Sections, and Details (2 of 4) 15 Dec 87 Arch SP 31 CD office review
275 Plans, Reflected Ceiling Plans, Elevations, Sections, and Details (3 of 4) 15 Dec 87 Arch SP 31 CD office review
276 Plans, Reflected Ceiling Plans, Elevations, Sections, and Details (4 of 4) 15 Dec 87 Arch SP 25 CD office review
277 Building Permit Set-Architectural Drawings (1 of 4) 15 Dec 87 Arch PT 30 CD office review
278 Building Permit Set-Architectural Drawings (2 of 4) 15 Dec 87 Arch PT 31 CD office review
279 Building Permit Set-Architectural Drawings (3 of 4) 15 Dec 87 Arch PT 31 CD office review
280 Building Permit Set-Architectural Drawings (4 of 4) 15 Dec 87 Arch PT 30 CD office review
282 General Revisions Set (1 of 2) 19 Jul 88 - 15 Dec 88 Arch PT, SP 23 CD office review
283 General Revisions Set (2 of 2) 19 Jul 88 - 15 Dec 88 Arch PT, SP 23 CD office review
284 Mechanical Coordination Drawings (1 of 6) n.d., 19 Jul 88 - 26 Jun 89 Arch, Mech PT, SP 25 CD
285 Mechanical Coordination Drawings (2 of 6) n.d., 19 Jul 88 - 26 Jun 89 Arch, Mech PT, SP 25 CD
286 Mechanical Coordination Drawings (3 of 6) n.d., 19 Jul 88 - 26 Jun 89 Arch, Mech PT, SP 25 CD
287 Mechanical Coordination Drawings (4 of 6) n.d., 19 Jul 88 - 26 Jun 89 Arch, Mech PT, SP 25 CD
288 Mechanical Coordination Drawings (5 of 6) n.d., 19 Jul 88 - 26 Jun 89 Arch, Mech PT, SP 25 CD
289 Mechanical Coordination Drawings (6 of 6) n.d., 19 Jul 88 - 26 Jun 89 Arch, Mech PT, SP 18 CD
293 Mechanical, Electrical, and Plumbing Record Drawings n.d., 5 Jan 87 - 9 Sept 87 P PT, SP 32 CD office review
294 Floor Plans, Underground Piping, Drainage, and Plumbing Penetrations n.d., 5 Jan 87 - 14 Jun 88 P PT, SP 12 CD
295 Pricing Set-Plans, Fire Protection, Drainage and Risers 15 Jan 87 P PT 16 CD office review
297 Record Sepias, Estimate Set 15 Jan 87 P, Elec SP 27 CD office review
298 75 Cambridge Parkway Record Set 25 Aug 87 P PT 27 CD office review
305 Complete M.E.P. Record Set of Construction Drawings (1 of 3) 15 Dec 87 - 19 Jun 89 P SP, PT 20 CD office review
306 Complete M.E.P. Record Set of Construction Drawings (2 of 3) 15 Dec 87 - 19 Jun 89 P SP, PT 25 CD office review
307 Complete M.E.P. Record Set of Construction Drawings (3 of 3) 15 Dec 87 - 15 May 89 P SP 22 CD office review
308 Plumbing Working Drawings (1 of 4) 15 Dec 87 P PT 34 CD office review
309 Plumbing Working Drawings (2 of 4) 15 Dec 87 P PT 35 CD office review
310 Plumbing Working Drawings (3 of 4) 15 Dec 87 P SP 34 CD office review
311 Plumbing Working Drawings (4 of 4) 15 Dec 87 P SP 35 CD office review
322 75 Cambridge Parkway Record Set 25 Aug 87 Mech PT 35 CD office review
332 Complete M.E.P. Record Set of Construction Drawings (1 of 3) 15 Dec 87 - 30 Jan 89 Mech SP 30 CD office review
333 Complete M.E.P. Record Set of Construction Drawings (2 of 3) 15 Dec 87 - 31 Mar 89 Mech SP 29 CD office review
334 Complete M.E.P. Record Set of Construction Drawings (3 of 3) 15 Dec 87 - 25 Mar 88 Mech SP 29 CD office review
335 Assorted Mechanical Drawings (1 of 2) 15 Dec 87 - 20 Nov 88 Mech PT, SP 19 CD office review
336 Assorted Mechanical Drawings (2 of 2) 15 Dec 87 - 20 Nov 88 Mech PT, SP 20 CD office review
337 Plans, Sections, Schedules, Diagrams, Control Lists, and Details (1 of 3) 15 Dec 87 Mech SP, PT 27 CD office review
338 Plans, Sections, Schedules, Diagrams, Control Lists, and Details (2 of 3) 15 Dec 87 Mech SP, PT 27 CD office review
339 Plans, Sections, Schedules, Motor Control Lists, and Details (3 of 3) 15 Dec 87 Mech SP, PT 28 CD office review
340 Building Permit Set-Mechanical Drawings (1 of 3) 15 Dec 87 Mech PT 27 CD office review
341 Building Permit Set-Mechanical Drawings (2 of 3) 15 Dec 87 Mech PT 27 CD office review
342 Building Permit Set-Mechanical Drawings (3 of 3) 15 Dec 87 Mech PT 27 CD office review
344 Complete M.E.P. Record Set of Construction Drawings 23 Mar 88 - 31 Mar 89 Mech SP 34 CD office review
347 Pricing Set-Plans, Riser Diagrams, Schedules and Details 15 Jan 87 Elec PT 11 CD office review
348 Record Set 15 Jan 87 Elec SP 11 CD office review
349 Lighting Design Drawings 4 Jun 87 - 4 Apr 89 Elec, Arch PT 26 CD office review
353 75 Cambridge Parkway Record Set (1 of 2) 25 Aug 87 Elec PT 25 CD office review
354 75 Cambridge Parkway Record Set (2 of 2) 25 Aug 87 Elec PT 25 CD office review
362 Record Set (1 of 2) 2 Nov 87 Elec PT 67 CD office review
363 Record Set (2 of 2) 2 Nov 87 Elec PT 34 CD office review
365 Electrical Working Drawings (1 of 2) 15 Dec 87 Elec PT 33 CD office review
366 Electrical Working Drawings (2 of 2) 15 Dec 87 Elec PT 34 CD office review
367 Lighting, Power and Systems, Plans, Kitchens, Schedules, and Details (1 of 2) 15 Dec 87 Elec PT 33 CD office review
368 Lighting, Power and Systems, Plans, Kitchens, Schedules, and Details (2 of 2) 15 Dec 87 Elec PT 34 CD office review
373 Complete M.E.P. Record Set of Construction Drawings (1 of 2) 25 Mar 88 - 19 Jan 89 Elec SP 33 CD office review
374 Complete M.E.P. Record Set of Construction Drawings (2 of 2) 25 Mar 88 - 18 Jan 89 Elec SP 35 CD office review
375 Lighting and Power Drawings (1 of 2) n.d., 7 Jun 88 - 13 Jun 88 Elec PT, SP 20 CD office review
376 Lighting and Power Drawings (2 of 2) n.d., 7 Jun 88 - 13 Jun 88 Elec PT, SP 20 CD office review
377 Lighting and Power Drawings 21 Jun 88 - 1 Nov 88 Elec PT 25 CD office review
378 Plans Showing Draft Inducer Switch Locations 20 Mar 89 - 25 Apr 89 Elec PT 9 CD
379 Architect' s Supplemental Instructions 10 May 88 - 4 Apr 89 Arch PT 29 CA
385 Reinforcing Steel Drawings (1 of 5) 2 Mar 88 - 9 Jul 88 Shp PT 28 CA
386 Reinforcing Steel Drawings (2 of 5) 2 Mar 88 - 9 Jul 88 Shp PT 29 CA
387 Reinforcing Steel Drawings (3 of 5) 2 Mar 88 - 9 Jul 88 Shp PT 28 CA
388 Reinforcing Steel Drawings (4 of 5) 29 Mar 88 - 7 Jul 88 Shp PT 29 CA
389 Reinforcing Steel Drawings (5 of 5) 29 Mar 88 - 7 Jul 88 Shp PT 30 CA
390 Elevations Showing Precast Concrete n.d., 9 May 88 Shp PT 19 CA
391 Precast Concrete Shop Drawings (1 of 5) n.d., 9 May 88 - 21 Dec 88 Shp PT 27 CA
392 Precast Concrete Shop Drawings (2 of 5) n.d., 9 May 88 - 21 Dec 88 Shp PT 28 CA
393 Precast Concrete Shop Drawings (3 of 5) n.d., 9 May 88 - 21 Dec 88 Shp PT 28 CA
394 Precast Concrete Shop Drawings (4 of 5) n.d., 9 May 88 - 21 Dec 88 Shp PT 28 CA
395 Precast Concrete Shop Drawings (5 of 5) n.d., 9 May 88 - 21 Dec 88 Shp PT 28 CA
396 Record Set - Fire Protection Drawings 16 May 88 - 11 Jul 89 Shp PT, SP 22 CA office review
399 Assorted Window Drawings (1 of 2) n.d., 27 May 88 - 21 Jun 88 Shp PT 24 CA
400 Assorted Window Drawings (2of 2) n.d., 27 May 88 - 21 Jun 88 Shp PT 25 CA
401 Assorted WIndow Frame, Flashing, and Metal Stud Shop Drawings n.d., 27 May 88 - 4 Aug 88 Shp PT 31 CA
404 Reinforcing Steel Drawings (1 of 3) 14 Jul 88 - 14 Oct 88 Shp PT 35 CA
405 Reinforcing Steel Drawings (2 of 3) 14 Jul 88 - 14 Oct 88 Shp PT 36 CA
406 Reinforcing Steel Drawings (3 of 3) 14 Jul 88 - 14 Oct 88 Shp PT 36 CA
410 Record Precast Concrete Panel Drawings (1 of 2) 19 Sept 88 - 23 Nov 88 Shp SP, PT 29 CA
411 Record Precast Concrete Panel Drawings (2 of 2) 19 Sept 88 - 23 Nov 88 Shp SP, PT 29 CA
415 Window Shop Drawings 23 Nov 88 Shp PT, SP 14 CA
416 Security System (2 sets) 15 Oct - 29 Oct 87 Arch PT 29 yes
417 Architectural Drawings (Plans) n.d., 11 Jun - 16 Jul 87 Arch PT 30
418 Structural Drawings: Progress Set 1 Oct - 14 Dec 87 S PT 22 yes
419 Architectural Drawings with Dimensions 15 Dec 87 - 6 Nov 88 Arch M 34