i The Safdie Hypermedia Archive - Project Inventory


   Skirball Cultural Center


Record Count: 34

Folder No. Title Dates Drawing Type Medium Drawings Project Phase Set Description Set Designation Set Type

1 Plumbing Drawings (Phase 1) ND.,08-05-1991 P PT 20 CD office review yes Office Review
2 Mechanical Drawings (Phase 1) ND., 08-22-1994 Mech PT 22 CD office review yes Office Review
3 Schematic Studies of Record Set (Phase 1): "sketches" plans and sections by Moshe Safdie Mar 24-31 1986 Arch TP 66 SD office review no Office Review
3 Schematic Studies of Record Set (Phase 1): site sections and perspectives; pencil on trace n.d. Arch TP 6 SD
3 Schematic Studies of Record Set (Phase 1): "sections"; pencil on trace n.d. Arch TP 32 SD
3 Schematic Studies of Record Set (Phase 1): perspectives; pencil on trace n.d. Arch TP 6 SD
3 Schematic Studies of Record Set (Phase 1): site plans and area calculations n.d. Arch PT 11 SD
3 Schematic Studies of Record Set (Phase 1): site plans, elevations, axionometrics; on mylar n.d. Arch M 7 SD
3 Schematic Studies of Record Set (Phase 1): "grids" n.d. Arch TP 9 SD
3 Schematic Studies of Record Set (Phase 1): "entrance" sketches and plans n.d. Arch TP 21
5 Record Set Prints (Phase 1) 04-22-1987 Arch PT 36 DD office reference yes Record Set
6 Design Development Set (Phase 1) 06-02-99 Arch PLTP 25 CD office review yes Design Development Set
7 Schematic Studies (Phase 1): photocopies of Moshe Safdie's sketches 1986 Arch V 22 PP office reference no Office reference
7 Schematic Studies (Phase 1): "compare plans" Hotel Belair, Getty Center, Hewbrew Union College, The Frick, Colagio Hebraio Maguin David 1986 Arch V 5 PP
7 Schematic Studies (Phase 1): "landscape" drawings (copies) 1986 Arch V 2
7 Schematic Studies (Phase 1): "program"; Hebrew Uinion College (space relationship diagram, phase I space program HUCLA) 1986 Arch V, TP 10 PP
7 Schematic Studies (Phase 1): "site eng" site plans and sections 1986 Arch Mix 37 PP
7 Schematic Studies (Phase 1): "lobby/bookstore" 1986 Arch TP 50 PP
7 Schematic Studies (Phase 1): gallery pavilion; south buttress debris basin; stair; topography; entry drop 1986 Arch TP, V 47 PP
7 Schematic Studies (Phase 1): "trellis" sketches by Moshe Safdie; on trace 1986 Arch TP 14 PP
7 Schematic Studies (Phase 1): "AUD" plans on trace 1986 Arch TP 21 PP
8 Electrical Drawings (Phase 1) 11-06-1989 Elec PT 26 CD office review yes Office Review
9 Phase 1 List of Drawings (A0-A2.30) 12-12-1990 Arch PT 32 DD office reference yes Office Reference
10 Architectural Details and Site Plans (Phase 1) March 1986 Arch, Sd Pt, TP, 14 SD office reference no Office reference
11 Concrete Construction Drawings (Phase 1) 1990-1991 Shp Pt 50 CD office reference no Office Reference
12 Concrete Construction Drawings (Phase 1) 1990-1991 Shp PT 51 cd office reference no Office reference
13 Academic Building Concrete Construction Drawings (Phase 1) 02-18-1992 Shp PT 43 CD office reference no Office Reference
14 Proposed Road Design (Phase 1) 11-08-1994 Shp PT 37 CD tender yes Tender
15 Architectural details and Shop Drawings (Phase 1) 1991-1992 Arch PT 47 CD office reference Office reference
16 Concrete Construction Details (Phase 1) 1991 Shp PT 68 CD office reference no Office refence
18 Foundation Construction Drawings (Phase 1) nd Shp PT 51 CD office reference no Office Reference
19 Drawing Set (Phase 1) 11-07-1988 Arch PT 98 CD tender yes Tender
20 Drawing Set (Phase 2) 09-08-1997 Arch PLTP 138 CD as-built yes As-Built
21 Floor Plans (Phase 1) 08-20-1987 Arch SP 6 DD