i The Safdie Hypermedia Archive - Project Inventory


   Ardmore Condominiums


Record Count: 16

Folder No. Title Dates Drawing Type Medium Drawings Project Phase Set Description Set Designation Set Type

1 Window and Maisonette Studies 21 Dec 79 - 2 Mar 80 Arch Mix 21 DD presentation
2 Assorted Design Development Drawings n.d. Arch Mix 22 DD
3 Floor Plans, Elevations, Framing and Ceiling Concept Plans 19 May 80 Arch V, SP 25 DD
6 General Site and Tree Planting Scheme, and Structural Working Drawings 1 Jan 80 - 11 Jan 83 Sd, S PT, SP 24 CD
7 Column Schedule and Structural Details 24 Sept 81 - 3 Nov 81 S PT 29 CD
8 Architectural Working Drawings, Building Sections, and Floor Plans (roll) Oct 81 - 28 Jul 83 Arch PT 28 CD tender
9 Assorted Details and Plans of Tiling, Marble, and Pump Room 24 Feb 82 - 12 Jul 83 Arch Mix 24 CD
15 Site and Architectural Schematic and Developmental Drawings 9 Jan 80 - Nov 83 Sd, Arch Mix 32 SD office review
16 Revisions from Phase I of Stair Sections and Bathroom Types 26 Jan 82 - 16 Aug 84 Arch V, SP 22 DD
17 Studies of Tile and Parquet Floor Patterns (roll) 15 Jul 84 - 22 Aug 84 Arch Mix 20 DD
19 Record Set of Site and Floor Plans Sent to Singapore May 1981 - 9 Nov 82 Sd PT, SP 20 CD tender
20 Site Plans and Tree Planting Schemes 14 Jan 82 - 15 Feb 86 Sd PT, PHC 12 CD
22 Plans, Building Sections, and Elevations (roll) 17 Jan 82 - 25 Mar 85 Arch Mix 26 CD tender
23 Kitchen, Bathroom, and Interior Details (roll) 1 Dec 82 - 15 Dec 82 Arch PT 30 CD office review
24 Site and Floor Plans, and Building Elevations 15 Dec 82 - 22 Oct 84 Arch PT, V 24 CD office review
25 Interior Details and Finishes, Kitchen, Bath, and Cabinets Details (roll) July 84 - 13 Mar 85 Arch, I Mix 36 CD