i The Safdie Hypermedia Archive - Project Inventory


   Stamford Urban Design


Record Count: 7

Box No. Box Name Folders Dates Dimensions Summary

PF 13b Miscellaneous 10 1983-1984 0.12 Progress Schedule; Atrium Skylight Drawings and Correspondence; Pool Cover; Dimensions and Calculations; Project Description; Code Analysis; Otis Elevator Company; Skylight Specifications;
PF 14a General; Drawings; Catalogs 17 1984-1987 0.3 Landscape and Street Photos; Map Drawings; Reprographics; Catalogs and Brochures; Architect Agreement; Meeting Minutes (Atrium); Schedule and Cost Estimate; Specifications; Zoning; Code Review; Drawings and Details; City Correspondence; Memorandum; Outstanding Balances; Title Blocks
PF 14b Contracts; Management 2 1984-1986 0.12 Parcel 38 Contract; Agreement; Budget and Fees; Project Description; Schedule; Status; Billing
PF 2 Meetings; General 39 1983-1987 0.34 Meeting Minutes; Drawing Lists; Drawings (copy); Correspondence (SLCE, re. Atrium, F.D. Rich, Cosentini; 6 Landmark Sware); Design Development; Fire Protection; Gardens; Memorandums; Billings; Interoffice Memos; Legal Issues; Offer of Services; Press Articles; Project Schedule.
PF 5 General; Correspondence 29 1973-1980 0.31 Storefront Design; 101 Plaza Contract; Consulting Engineers; Theatre Consultant; Agenda and Meeting Minutes; Interior Design; Code Compliance; Clippings; Amendment; South-West Building; Annex; Playhouse; Prudential and Rich Correspondence and Minutes; Master Plan; Client Correspondence; Friedman Correspondence; Market Report; Some Sketches (Bill Gillit)
PF 6 General; Specifications 15 1973-1979 0.18 Transmittals; Stamford Forum Hotel; Stamford Centre; Town Center; Model; Specifications; Parcel 38; 101 Plaza East; Project Manual for Six Landmark Square Offices
PF 7 Correspondence; Studies 12 1982-1987 0.15 6 Landmark Square Correspondence; Incoming and Outgoing Transmittals; Consultants; Soil Testing; Population Studies; Models