Box No. |
Box Name |
Folders |
Dates |
Dimensions |
Summary |
|
1 |
Correspondence and Codes |
13 |
1996-2004 |
0.4 |
Consultant and contractor correspondence (Turner, MVVA); codes |
10 |
Contractor Request for Information (RFIs), Manuals |
7 |
2001-2003 |
0.33 |
Field Reports, HVAC Operation Manual, Electrical Operation and Maintenance Manual |
11 |
Contractor Request for Information (RFIs) |
3 |
2001 |
0.29 |
|
12 |
Contractor Request for Information (RFIs) |
4 |
2001-2002 |
0.28 |
|
13 |
Monthly Project Reports |
24 |
2001-2003 |
0.22 |
Includes colour photos |
14 |
Submittals, Costs, Reviews, Meeting Minutes, Publications, Drawings, Photos |
27 |
1999-2002 |
0.38 |
Includes material samples, newspaper articles, CAD drawings in colour |
15 |
Project Manuals, Proposals |
6 |
1996-2001 |
0.38 |
Subcontractor proposals, proposal to the City of Salem, material samples |
16 |
Engineers Supplemental Instructions |
5 |
2002-2003 |
0.23 |
Various recipients |
17 |
Architectural Sketches (ASK) |
3 |
2000-2003 |
0.28 |
|
18 |
Architectural Sketches (ASK) |
13 |
2000-2003 |
0.38 |
Logs, structural, electrical, fire protection, plumbing, mechanical |
19 |
Assorted Architectural Sketches, Detail Manual Binder |
13 |
1999-2001 |
0.32 |
Signage, security, woodworking, subcontractors - HCI, Von Roll, Ducibella; spine detail |
2 |
Correspondence - Client |
18 |
1996-2004 |
0.4 |
Various recipients |
20 |
Construction Punch Lists, Code, Field Reports |
4 |
1997-2003 |
0.38 |
|
21 |
Architects Supplemental Instructions |
4 |
2000-2003 |
0.34 |
|
22 |
Geotechnical (Miller) Testing, Project Team Notes |
10 |
1998-2003 |
0.34 |
Handwritten and handdrawn project notes |
23 |
Sketches, Landscape Architect Special Instructions, Signage |
10 |
2002-2003 |
0.38 |
Various recipients, includes ASKs |
24 |
Key Design Studies, Alternative Site Studies, ASI Binder |
13 |
1997-2003 |
0.25 |
Includes handdrawn sketches, photos |
25 |
Key Contract Submittals, Shop Drawings |
5 |
2001-2003 |
0.25 |
General requirements, site construction, concrete, masonry, metals, wood/plastics/composites, thermal and moisture protection; includes material samples |
26 |
Key Contract Submittals, Shop Drawings |
6 |
2000-2002 |
0.3 |
Doors and windows, finishes, specialties, equipment, furnishings, special construction, mechanical, electrical; includes material samples |
3 |
Correspondence - MSA and Moshe Safdie, MSA Drawings and Printings |
24 |
1996-2007 |
0.4 |
Various recipients; drawings include colour highlights and notations |
4 |
Project Correspondence - ARUP |
11 |
1998-2003 |
0.4 |
Structural, lighting, fire, plumbing, general; includes subcontractor correspondence |
5 |
Project Correspondence - FMS/ARUP |
15 |
1996-2003 |
0.4 |
Drawings with notations |
6 |
Project Budgets, Cost Estimates |
8 |
1997-2000 |
0.25 |
|
7 |
Cost Estimate, Change Order, Budget Schedule |
16 |
1996-2003 |
0.4 |
Project schedule, project budgets; ink notation on some documents |
8 |
Contractor Request for Information (RFIs), Shop Drawings, Sign Program |
4 |
2001-2003 |
0.4 |
Shop drawings from American Architectural Iron and Turner Construction |
9 |
Contractor Request for Information (RFIs) |
23 |
1999-2002 |
0.4 |
|