Box No. Box Name Folders Dates Dimensions Summary

1 Correspondence and Codes 13 1996-2004 0.4 Consultant and contractor correspondence (Turner, MVVA); codes
10 Contractor Request for Information (RFIs), Manuals 7 2001-2003 0.33 Field Reports, HVAC Operation Manual, Electrical Operation and Maintenance Manual
11 Contractor Request for Information (RFIs) 3 2001 0.29
12 Contractor Request for Information (RFIs) 4 2001-2002 0.28
13 Monthly Project Reports 24 2001-2003 0.22 Includes colour photos
14 Submittals, Costs, Reviews, Meeting Minutes, Publications, Drawings, Photos 27 1999-2002 0.38 Includes material samples, newspaper articles, CAD drawings in colour
15 Project Manuals, Proposals 6 1996-2001 0.38 Subcontractor proposals, proposal to the City of Salem, material samples
16 Engineers Supplemental Instructions 5 2002-2003 0.23 Various recipients
17 Architectural Sketches (ASK) 3 2000-2003 0.28
18 Architectural Sketches (ASK) 13 2000-2003 0.38 Logs, structural, electrical, fire protection, plumbing, mechanical
19 Assorted Architectural Sketches, Detail Manual Binder 13 1999-2001 0.32 Signage, security, woodworking, subcontractors - HCI, Von Roll, Ducibella; spine detail
2 Correspondence - Client 18 1996-2004 0.4 Various recipients
20 Construction Punch Lists, Code, Field Reports 4 1997-2003 0.38
21 Architects Supplemental Instructions 4 2000-2003 0.34
22 Geotechnical (Miller) Testing, Project Team Notes 10 1998-2003 0.34 Handwritten and handdrawn project notes
23 Sketches, Landscape Architect Special Instructions, Signage 10 2002-2003 0.38 Various recipients, includes ASKs
24 Key Design Studies, Alternative Site Studies, ASI Binder 13 1997-2003 0.25 Includes handdrawn sketches, photos
25 Key Contract Submittals, Shop Drawings 5 2001-2003 0.25 General requirements, site construction, concrete, masonry, metals, wood/plastics/composites, thermal and moisture protection; includes material samples
26 Key Contract Submittals, Shop Drawings 6 2000-2002 0.3 Doors and windows, finishes, specialties, equipment, furnishings, special construction, mechanical, electrical; includes material samples
3 Correspondence - MSA and Moshe Safdie, MSA Drawings and Printings 24 1996-2007 0.4 Various recipients; drawings include colour highlights and notations
4 Project Correspondence - ARUP 11 1998-2003 0.4 Structural, lighting, fire, plumbing, general; includes subcontractor correspondence
5 Project Correspondence - FMS/ARUP 15 1996-2003 0.4 Drawings with notations
6 Project Budgets, Cost Estimates 8 1997-2000 0.25
7 Cost Estimate, Change Order, Budget Schedule 16 1996-2003 0.4 Project schedule, project budgets; ink notation on some documents
8 Contractor Request for Information (RFIs), Shop Drawings, Sign Program 4 2001-2003 0.4 Shop drawings from American Architectural Iron and Turner Construction
9 Contractor Request for Information (RFIs) 23 1999-2002 0.4