Folder No. |
Title |
Dates |
Drawing Type |
Medium |
Drawings |
Project Phase |
Set Description |
Set Designation |
Set Type |
|
1 |
Site Photographs |
n.d. |
Ref |
PT |
3 |
PP |
|
|
|
2 |
Preliminary Plans and Elevations |
18 May - 8 Jul 82 |
Arch |
Mix |
48 |
SD |
|
|
|
3 |
Preliminary drawings: Oversized design process drawing by Moshe Safdie on trace |
18 May - 24 Sep 92 |
Arch |
TP |
1 |
SD |
|
|
|
3 |
Preliminary drawings: Set: Perspectives, sections, renderings (copies) |
18 May - 24 Sep 92 |
Arch |
Mix |
45 |
SD |
|
|
|
3 |
Preliminary drawings: Floor plan option sketches (copies) |
18 May - 24 Sep 92 |
Arch |
Mix |
5 |
SD |
|
|
|
3 |
Preliminary drawings: Set: existing site conditions |
18 May - 24 Sep 92 |
Arch |
Mix |
5 |
SD |
|
|
|
3 |
Preliminary drawings: SD Progress set May-September 1992 |
18 May - 24 Sep 92 |
Arch |
Mix |
29 |
SD |
|
|
|
3 |
Preliminary drawings: Sketch plan updates. Drawing 304-308. September 1992 |
Sep 92 |
Arch |
Mix |
5 |
SD |
|
|
|
3 |
Preliminary drawings: parking sketch details June 1992 |
Jun 92 |
Arch |
Mix |
2 |
SD |
|
|
|
3 |
Preliminary drawings: trace plan updates July 1992 |
Jul 92 |
Arch |
Mix |
3 |
SD |
|
|
|
3 |
Preliminary drawings: Set 11x17 drawings mechanical concept sketches |
18 May - 24 Sep 92 |
Arch |
Mix |
10 |
SD |
|
|
|
3 |
Preliminary drawings: misc setting out drawings |
18 May - 24 Sep 92 |
Arch |
Mix |
6 |
SD |
|
|
|
4 |
Preliminary library drawings: Set elevation and section studies |
28 Jun - 23 Oct 92 |
Arch |
Mix |
7 |
SD |
|
|
|
4 |
Preliminary library drawings: expansion study |
28 Jun - 23 Oct 92 |
Arch |
Mix |
6 |
SD |
|
|
|
4 |
Preliminary library drawings: expansion option 1-2 |
28 Jun - 23 Oct 92 |
Arch |
Mix |
7 |
SD |
|
|
|
4 |
Preliminary library drawings: upper level relocation options February 1992 |
28 Jun - 23 Oct 92 |
Arch |
Mix |
4 |
SD |
|
|
|
4 |
Preliminary library drawings: Programming and stacking working drawings |
28 Jun - 23 Oct 92 |
Arch |
Mix |
47 |
SD |
|
|
|
5 |
Preliminary Drawings: Office Tower |
27 Jul - 3 Sept 92 |
Arch |
Mix |
23 |
SD |
|
|
|
6 |
Roof Plans |
10 Jun - 25 Oct 92 |
Arch |
PT |
3 |
SD |
|
|
|
7 |
Daycare and Retail Block |
n.d., 25 Aug - 22 Sep 92 |
Arch |
PT |
6 |
SD |
|
|
|
8 |
Site Plans; Shadow Studies and Analysis |
8 Sep 92 - 20 Jul 93 |
Arch |
Mix |
25 |
SD |
|
|
|
9 |
Auditorium Seating Studies |
23 Feb 93 |
Arch |
Mix |
12 |
SD |
|
|
|
10 |
Sketches: Interiors |
n.d., 13 Jul 93 - 5 Feb 94 |
Arch |
PT |
76 |
SD |
|
|
|
11 |
Final Schematic Design Review |
15 Aug - 3 Sep 92 |
Arch |
Mix |
56 |
DD |
|
|
|
12 |
In Progress Set (50% Library; 90% Tower) - Plans, Sections, elevations |
13 Nov 92 |
Arch |
Mix |
44 |
DD |
|
yes |
|
13 |
Library Progress Set (50%): Plans, Sections, Elevations |
3 May 93 - 29 Apr 94 |
Arch |
PT |
70 |
DD |
|
yes |
|
14 |
Library Progress Set (90%) |
23 Aug 93 |
Arch |
PT |
63 |
DD |
|
yes |
|
15 |
Furniture Layout and Design: Library Levels (L1,L2,L3,L4,L5,L6,L7) Furniture layout (7 superceded) |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
7 |
DD |
|
|
|
15 |
Furniture Layout and Design: No. 4 chair |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
1 |
SD |
|
|
|
15 |
Furniture Layout and Design: Library chair and design sketches |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
1 |
SD |
|
|
|
15 |
Furniture Layout and Design: Level 7 scheme A (marker on yellow trace) |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
TP |
1 |
DD |
|
|
|
15 |
Furniture Layout and Design: Book conveyor |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
1 |
DD |
|
|
|
15 |
Furniture Layout and Design: Study of 2 and 4 person arcade tables |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
1 |
DD |
|
|
|
15 |
Furniture Layout and Design: study of 2 and 4 person, library block, metal-framed, tables and carrels |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
1 |
SD |
|
|
|
15 |
Furniture Layout and Design: Bullpen D, E, F, G, H, I |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
6 |
SD |
|
|
|
15 |
Furniture Layout and Design: Study A reading chair block edge tables |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
1 |
DD |
|
|
|
15 |
Furniture Layout and Design: Library Levels (1,2,3,4,5,6,7) furniture plan |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
7 |
DD |
|
|
|
15 |
Furniture Layout and Design: Bullpen plans (levels 1,2,3,)level 4,( level 5,6, 7) |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
3 |
DD |
|
|
|
15 |
Library levels 1-7, office systems furniture key plan |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
7 |
DD |
|
|
|
15 |
Furniture Layout and Design: unmarked drawings of chairs |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
6 |
DD |
|
|
|
15 |
Furniture Layout and Design: unmarked sketches of chairs (1 is "Keilhauer") |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
4 |
DD |
|
|
|
15 |
Library level 1 and (level 1 & 7) office systems furniture detail plan |
n.d., 3 Mar 93 - 12 Jan 95 |
I |
Mix |
2 |
DD |
|
|
|
16 |
Plaza Paving/Landscaping |
4 Jul 94 |
Sd |
Mix |
23 |
DD |
tender |
yes |
tender |
17 |
Development Permit Application Sets |
22 Dec 92 - 2 Jun 93 |
Arch |
Mix |
69 |
CD |
|
yes |
application for permit |
18 |
Architectural Drawings: Reflected Ceiling Plans |
6 Oct - 26 Oct 92 |
Arch |
Mix |
25 |
CD |
|
|
|
19 |
Working Drawings: Office Tower Floor Plans |
26 Oct 92 |
Arch |
V |
9 |
CD |
|
|
|
20 |
Pricing Set (A1-A3) |
26 Mar - 19 Apr 93 |
Arch |
Mix |
50 |
CD |
|
yes |
|
21 |
Pricing Set (A4-A6): Structural (Tower/Furnishings) and Architectural Drawings |
19 Apr 93 |
Arch, S |
Mix |
49 |
CD |
|
yes |
|
22 |
Structural Drawings: Building Permit Set |
23 Apr 93 |
S |
PT |
19 |
CD |
|
yes |
permit set |
23 |
Architectural Drawings: Building Permit Sets |
23 Apr 93 |
Arch |
PT |
24 |
|
|
yes |
permit set |
24 |
Alternate Structural Scheme for Arcade |
23 Jun 93 |
S |
PT |
2 |
CD |
|
|
|
25 |
Office Tower and Parkade Tender Set |
8 Nov 93 |
Arch |
PT |
34 |
CD |
|
yes |
tender |
26 |
Enlarged Detail Plans (A6) |
16 Aug 93 - 28 Feb 94 |
Arch |
Mix |
35 |
CD |
|
|
|
27 |
Construction Set: Office Tower and Parkade |
16 Aug - 8 Nov 93 |
Arch |
PT |
65 |
CD |
|
yes |
|
28 |
Construction Set - All Contracts |
6 Dec 93 |
Arch |
PT |
44 |
CD |
|
yes |
|
29 |
Elevators and Ecalators: Tender Set |
15 Mar - 7 Jun 93 |
Arch |
PT |
49 |
CD |
tender |
yes |
tender |
30 |
Floor Plans (A1): Parking, Library, Office Tower |
7 Aug 92 - 10 Sep 93 |
Arch |
Mix |
19 |
CD |
tender |
yes |
tender |
31 |
Floor Plans (A2): Library Levels, Retail, Daycare, Roof Plaza |
16 Aug - 17 Dec 93 |
Arch |
Mix |
64 |
CD |
|
|
|
32 |
Ceiling Plans (A3) |
10 Aug - 10 Sep 93 |
Arch |
Mix |
15 |
CD |
|
|
|
33 |
Detail Sections (A5) |
16 Mar 93 - 21 Feb 94 |
Arch |
Mix |
38 |
CD |
|
|
|
34 |
Interior Elevations (A7) |
6 Dec 93 - 28 Feb 94 |
Arch |
PT |
5 |
CD |
|
|
|
35 |
Tender Set: Superstructural/Precast |
3 May 93 |
Arch, Mech, Elec |
PT |
66 |
CD |
tender |
yes |
tender |
36 |
Tender Sets: Structural |
22 Sep - 15 Oct 93 |
S |
PT |
93 |
CD |
tender |
yes |
tender |
37 |
Tender Sets: Electrical |
28 Apr - 1 Nov 93 |
Elec |
PT |
79 |
CD |
tender |
yes |
tender |
38 |
Mechanical Drawings - Fire Protection |
25 Nov 93 - 7 Jan 94 |
Mech |
PHC |
23 |
CD |
|
|
|
39 |
Mechanical Drawings - Library Tender Set |
15 Mar - 10 Sep 93 |
Mech |
PT |
93 |
CD |
tender |
yes |
tender |
40 |
Tender Sets: Washrooms |
21 Mar 94 |
Arch |
PT |
6 |
CD |
tender |
yes |
tender |
41 |
Tender Set: Carpet Tiles |
2 Feb 94 |
Arch |
PT |
15 |
CD |
tender |
yes |
tender |
42 |
Working Drawings Issued for CCF (A2-A6) |
3 June 94 |
Arch |
PT |
20 |
CD |
|
yes |
|
43 |
Working Drawings Issued for CCF (A6.2.2-A7.2.4) |
3 Jun 94 |
Arch |
PT |
12 |
CD |
|
yes |
|