i The Safdie Hypermedia Archive - Project Inventory


   Vancouver Library Square


Record Count: 70

Folder No. Title Dates Drawing Type Medium Drawings Project Phase Set Description Set Designation Set Type

1 Site Photographs n.d. Ref PT 3 PP
2 Preliminary Plans and Elevations 18 May - 8 Jul 82 Arch Mix 48 SD
3 Preliminary drawings: Oversized design process drawing by Moshe Safdie on trace 18 May - 24 Sep 92 Arch TP 1 SD
3 Preliminary drawings: Set: Perspectives, sections, renderings (copies) 18 May - 24 Sep 92 Arch Mix 45 SD
3 Preliminary drawings: Floor plan option sketches (copies) 18 May - 24 Sep 92 Arch Mix 5 SD
3 Preliminary drawings: Set: existing site conditions 18 May - 24 Sep 92 Arch Mix 5 SD
3 Preliminary drawings: SD Progress set May-September 1992 18 May - 24 Sep 92 Arch Mix 29 SD
3 Preliminary drawings: Sketch plan updates. Drawing 304-308. September 1992 Sep 92 Arch Mix 5 SD
3 Preliminary drawings: parking sketch details June 1992 Jun 92 Arch Mix 2 SD
3 Preliminary drawings: trace plan updates July 1992 Jul 92 Arch Mix 3 SD
3 Preliminary drawings: Set 11x17 drawings mechanical concept sketches 18 May - 24 Sep 92 Arch Mix 10 SD
3 Preliminary drawings: misc setting out drawings 18 May - 24 Sep 92 Arch Mix 6 SD
4 Preliminary library drawings: Set elevation and section studies 28 Jun - 23 Oct 92 Arch Mix 7 SD
4 Preliminary library drawings: expansion study 28 Jun - 23 Oct 92 Arch Mix 6 SD
4 Preliminary library drawings: expansion option 1-2 28 Jun - 23 Oct 92 Arch Mix 7 SD
4 Preliminary library drawings: upper level relocation options February 1992 28 Jun - 23 Oct 92 Arch Mix 4 SD
4 Preliminary library drawings: Programming and stacking working drawings 28 Jun - 23 Oct 92 Arch Mix 47 SD
5 Preliminary Drawings: Office Tower 27 Jul - 3 Sept 92 Arch Mix 23 SD
6 Roof Plans 10 Jun - 25 Oct 92 Arch PT 3 SD
7 Daycare and Retail Block n.d., 25 Aug - 22 Sep 92 Arch PT 6 SD
8 Site Plans; Shadow Studies and Analysis 8 Sep 92 - 20 Jul 93 Arch Mix 25 SD
9 Auditorium Seating Studies 23 Feb 93 Arch Mix 12 SD
10 Sketches: Interiors n.d., 13 Jul 93 - 5 Feb 94 Arch PT 76 SD
11 Final Schematic Design Review 15 Aug - 3 Sep 92 Arch Mix 56 DD
12 In Progress Set (50% Library; 90% Tower) - Plans, Sections, elevations 13 Nov 92 Arch Mix 44 DD yes
13 Library Progress Set (50%): Plans, Sections, Elevations 3 May 93 - 29 Apr 94 Arch PT 70 DD yes
14 Library Progress Set (90%) 23 Aug 93 Arch PT 63 DD yes
15 Furniture Layout and Design: Library Levels (L1,L2,L3,L4,L5,L6,L7) Furniture layout (7 superceded) n.d., 3 Mar 93 - 12 Jan 95 I Mix 7 DD
15 Furniture Layout and Design: No. 4 chair n.d., 3 Mar 93 - 12 Jan 95 I Mix 1 SD
15 Furniture Layout and Design: Library chair and design sketches n.d., 3 Mar 93 - 12 Jan 95 I Mix 1 SD
15 Furniture Layout and Design: Level 7 scheme A (marker on yellow trace) n.d., 3 Mar 93 - 12 Jan 95 I TP 1 DD
15 Furniture Layout and Design: Book conveyor n.d., 3 Mar 93 - 12 Jan 95 I Mix 1 DD
15 Furniture Layout and Design: Study of 2 and 4 person arcade tables n.d., 3 Mar 93 - 12 Jan 95 I Mix 1 DD
15 Furniture Layout and Design: study of 2 and 4 person, library block, metal-framed, tables and carrels n.d., 3 Mar 93 - 12 Jan 95 I Mix 1 SD
15 Furniture Layout and Design: Bullpen D, E, F, G, H, I n.d., 3 Mar 93 - 12 Jan 95 I Mix 6 SD
15 Furniture Layout and Design: Study A reading chair block edge tables n.d., 3 Mar 93 - 12 Jan 95 I Mix 1 DD
15 Furniture Layout and Design: Library Levels (1,2,3,4,5,6,7) furniture plan n.d., 3 Mar 93 - 12 Jan 95 I Mix 7 DD
15 Furniture Layout and Design: Bullpen plans (levels 1,2,3,)level 4,( level 5,6, 7) n.d., 3 Mar 93 - 12 Jan 95 I Mix 3 DD
15 Library levels 1-7, office systems furniture key plan n.d., 3 Mar 93 - 12 Jan 95 I Mix 7 DD
15 Furniture Layout and Design: unmarked drawings of chairs n.d., 3 Mar 93 - 12 Jan 95 I Mix 6 DD
15 Furniture Layout and Design: unmarked sketches of chairs (1 is "Keilhauer") n.d., 3 Mar 93 - 12 Jan 95 I Mix 4 DD
15 Library level 1 and (level 1 & 7) office systems furniture detail plan n.d., 3 Mar 93 - 12 Jan 95 I Mix 2 DD
16 Plaza Paving/Landscaping 4 Jul 94 Sd Mix 23 DD tender yes tender
17 Development Permit Application Sets 22 Dec 92 - 2 Jun 93 Arch Mix 69 CD yes application for permit
18 Architectural Drawings: Reflected Ceiling Plans 6 Oct - 26 Oct 92 Arch Mix 25 CD
19 Working Drawings: Office Tower Floor Plans 26 Oct 92 Arch V 9 CD
20 Pricing Set (A1-A3) 26 Mar - 19 Apr 93 Arch Mix 50 CD yes
21 Pricing Set (A4-A6): Structural (Tower/Furnishings) and Architectural Drawings 19 Apr 93 Arch, S Mix 49 CD yes
22 Structural Drawings: Building Permit Set 23 Apr 93 S PT 19 CD yes permit set
23 Architectural Drawings: Building Permit Sets 23 Apr 93 Arch PT 24 yes permit set
24 Alternate Structural Scheme for Arcade 23 Jun 93 S PT 2 CD
25 Office Tower and Parkade Tender Set 8 Nov 93 Arch PT 34 CD yes tender
26 Enlarged Detail Plans (A6) 16 Aug 93 - 28 Feb 94 Arch Mix 35 CD
27 Construction Set: Office Tower and Parkade 16 Aug - 8 Nov 93 Arch PT 65 CD yes
28 Construction Set - All Contracts 6 Dec 93 Arch PT 44 CD yes
29 Elevators and Ecalators: Tender Set 15 Mar - 7 Jun 93 Arch PT 49 CD tender yes tender
30 Floor Plans (A1): Parking, Library, Office Tower 7 Aug 92 - 10 Sep 93 Arch Mix 19 CD tender yes tender
31 Floor Plans (A2): Library Levels, Retail, Daycare, Roof Plaza 16 Aug - 17 Dec 93 Arch Mix 64 CD
32 Ceiling Plans (A3) 10 Aug - 10 Sep 93 Arch Mix 15 CD
33 Detail Sections (A5) 16 Mar 93 - 21 Feb 94 Arch Mix 38 CD
34 Interior Elevations (A7) 6 Dec 93 - 28 Feb 94 Arch PT 5 CD
35 Tender Set: Superstructural/Precast 3 May 93 Arch, Mech, Elec PT 66 CD tender yes tender
36 Tender Sets: Structural 22 Sep - 15 Oct 93 S PT 93 CD tender yes tender
37 Tender Sets: Electrical 28 Apr - 1 Nov 93 Elec PT 79 CD tender yes tender
38 Mechanical Drawings - Fire Protection 25 Nov 93 - 7 Jan 94 Mech PHC 23 CD
39 Mechanical Drawings - Library Tender Set 15 Mar - 10 Sep 93 Mech PT 93 CD tender yes tender
40 Tender Sets: Washrooms 21 Mar 94 Arch PT 6 CD tender yes tender
41 Tender Set: Carpet Tiles 2 Feb 94 Arch PT 15 CD tender yes tender
42 Working Drawings Issued for CCF (A2-A6) 3 June 94 Arch PT 20 CD yes
43 Working Drawings Issued for CCF (A6.2.2-A7.2.4) 3 Jun 94 Arch PT 12 CD yes